Laserfiche WebLink
Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> 4.8.6 Mining out Hospital Creek and constructing a berm to 4.8.6 The applicant shall implement the Mining Plan Option 1 as described Implementation of <br /> form a large detention basin(Mining Plan Option 2)would in Chapter 3.0, Project Description,and shown graphically in Figure Mitigation Measure <br /> substantially alter the natural hydrology of Hospital 3-3.Mining Plan Option 1 requires the applicant to leave Hospital 4.8.6 would eliminate <br /> Creek.This option would permanently remove surface Creek in place,mining both sides with a 100-foot setback from the the downstream <br /> water flows from the reach of Hospital Creek downstream cantering of the creek to the top of the mining slope. hydrologic issues <br /> of the proposed mining operations leading to depletion of associated with <br /> flows to downstream receiving water bodies, reduction of removing Hospital <br /> surface water available for localized infiltration,or Creek under Mining <br /> elimination of adequate water Flow for aquatic and Plan Option 2. <br /> riparian habitats.This would be a significant impact.(S) Implementing Mitigation <br /> Measure 4.8.6 would <br /> ensure that significant <br /> impacts related to <br /> Mining Plan Option 2 <br /> would not occur. <br /> However, if Mitigation <br /> Measure 4.8.6 is not <br /> implemented and <br /> Mining Plan Option 2 is <br /> identified as the <br /> preferred approach to <br /> mining adjacent to <br /> Hospital Creek,then <br /> the impacts to <br /> hydrology,as described <br /> above,would remain <br /> significant. <br /> 4.8.7 Mining operation would alter the natural,preferential flow No mitigation is required. <br /> pathways of surface water resulting in areas of localized <br /> onsite flooding.This is a less-than-significant impact.(LS) <br /> Cemex Vernalis Quarry Mining and Redama nPmled ES-15 ESA 1203019 <br /> Final Environmental Impad Report June 2009 <br />