Laserfiche WebLink
Revised Traffic Impact Study March 27,2008 <br /> Proposed CEMEX Mining Site Page 4 <br /> Table 1 <br /> Project Trip Generation <br /> ►� .hype Annual Maximum Peak <br /> Average Volumes Volumes <br /> i Annual Loads <br /> 'r Production(tons) 2,850,000 4,000,000 4,000,000 <br /> Aggregate Truck Loads 25 tons/truck 114,000 160,000 160,000 <br /> Recycling Truck Loads 470 780 780 <br /> Cement Truck Loads 470 780 780 <br /> Annual Trips <br /> Aggregate Truck Trips(Inbound+Outbound) 228,000 160,000 160,000 <br /> Recycled Material Truck Trips 940 1,560 1,560 <br /> Cement Truck Trips(Inbound+Outbound) 940 1,560 1,560 <br /> Total Truck Trips 229,880 323,120 323,120 <br /> Daily Loads(260 da s/ ear <br /> Aggregate Tmck Loads 439 613 981 <br /> Recycled Truck Loads 3 3 5 <br /> Cement Truck Loads 3 3 5 <br /> Daily Trips <br /> Employee Tris on-Truck 80 80 80 <br /> Aggregate Truck Trips(Inbound+Outbound) 878 1,226 1,962 <br /> Recycled Material Truck Trips 6 6 10 <br /> ►. Cement Truck Tris bound+Outbound 6 6 10 <br /> Total Truck Trips 890 1,238 1,982 <br /> Hourly Trips <br /> Average Aggregate Tmck Loads 8 hours/da 55 77 123 <br /> Peak Hour Truck Loads(1.25 x average) 69 96 153 <br /> Total Peak Hour Trips(Inbound+Outbound) 138 192 306 <br /> r <br /> 53 —Pendine and Approved Project Traffic Volumes <br /> The near-term analyses consider the cumulative effects of traffic expected to be generated by <br /> pending and approved projects in the vicinity of the Project site. An approved mining site that is not <br /> L yet in operation exists on Bird Road south of Blewett Road (Granite Quarry, formerly Brown Sand <br /> and Gravel). The typical peak hour project traffic anticipated to be generated by the Project is <br /> included in the analyses. The traffic volumes expected to be generated by the Granite Quarry are <br /> presented in Figure 9. These approved-project traffic volumes were estimated based on a review of <br /> the Environmental Impact Reports for Brown Sand and Gravel (final report dated July 1997, State <br /> Clearing House Number 96042075). <br /> IN Other proposed and approved projects in the vicinity of the Project site were not included in the <br /> values presented in Figure 9 because they are currently operating. Pending or approved projects in <br /> l the vicinity of the Project site that were considered but not added to Figure 9 are: <br /> V <br /> • DSS Quarry— Southwest of Blewett and Koster Roads <br /> • Teichert East and West—Expansion of reserve areas for existing plant at Bird and Blewett Roads <br /> r„ • West Coast Aggregates "Valley Rock'—Expansion of existing operation at 37350 S. Bird Rd. <br /> 5.4—Near-Term Traffic Volumes <br /> Near-term-without-Project traffic volumes are presented in Figure 10 and were determined by <br /> adding the existing traffic volumes and the pending/approved-project traffic volumes. Near-term- <br /> 0 <br /> L <br /> L <br />