Laserfiche WebLink
Toxic Substances Control, the Regional Water Quality Control Board, or the San Joaquin <br /> County Environmental Health Department. Encountering contaminated soil, surface water, and <br /> groundwater without taking proper precautions could result in the exposure of construction <br /> workers and consequently result in associated significant adverse human health and <br /> environmental impacts. (Draft EIR, p. 4.11-12.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Previously unidentified contamination may be encountered during project site <br /> preparation, construction activities, and mining activities. See Draft EIR,pp. 4.11-12 to 4.11-13. <br /> Mitigation Measures <br /> Mitigation Measure 4.11.1: If contaminated soil and/or groundwater are encountered or <br /> suspected contamination is encountered during site clearing, construction activities, and mining <br /> activities, work shall be halted in the area of concern. The Applicant shall determine the type and <br /> extent of the contamination by consulting with the appropriate regulatory agencies (RWQCB, <br /> DTSC, and/or the San Joaquin or Stanislaus County Health Department) and implementing any <br /> necessary measures, such as soil and/or groundwater sampling and analysis. If required by the <br /> regulatory agencies, a remediation plan shall be implemented either in conjunction with or prior <br /> to continued project construction and/or mining activities. (Draft EIR, p. 4.11-13.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.11.1, impacts related to encountering existing and/or previously unidentified <br /> contamination are reduced to a less than significant level. (Draft EIR,p. 4.11-13.) <br /> Impact 4.11.2 <br /> During excavation, grading, and construction activities of the proposed facilities, it is <br /> anticipated that limited quantities of miscellaneous hazardous substances, such as gasoline, <br /> diesel feel, hydraulic fluid, solvents, oils, etc. would be brought onto the site. In addition, the <br /> proposed project operations will include the use offuels and other hazardous materials. As with <br /> any liquid and solid, during handling and transfer from one container to another, the potential <br /> for an accidental release exists. Depending on the relative hazard of the material, if a spill were <br /> to occur of signiflcant quantity, the accidental release could pose both a hazard to construction <br /> employees as well as the environment. (Draft EIR, p. 4.11-13.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Limited quantities of miscellaneous hazardous substances could be brought onto or <br /> accidentally released onto the site during excavation, grading, and construction activities. See <br /> Draft EIR, p. 4.11-13. <br /> Mitigation Measures <br /> Mitigation Measure 4.11.2: The project applicant shall ensure that all contractors and <br /> 27 <br />