My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure 6.9: Implement Mitigation Measures 4.9.2a, 4.9.2b, and 4.9.2c to mitigate <br /> the project's incremental contribution to biological resource impacts. (Draft EIR,p. 6-15.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 6.9.1, the project's contribution to cumulative biological resource impacts are reduced <br /> to a less than significant level. (Draft EIR,p. 6-15.) <br /> Impact 6.10 <br /> The project's contribution to cumulative impacts to cultural resources is potentially significant. <br /> (Draft EIR,p. 6-15.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Cumulative project could result in impact to potential archeological sites. See Draft EIR, <br /> p. 6-15. <br /> Mitigation Measures <br /> Mitigation Measure 6.10: Implement Mitigation Measures 4.10.1, and 4.10.2 to mitigate the <br /> project's incremental contribution to cultural resource impacts. (Draft EIR, p. 6-15.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 6.10.1, the project's contribution to cumulative cultural resource impacts are reduced <br /> to a less than significant level. (Draft EIR,p. 6-15.) <br /> D.3. FINDINGS REGARDING IMPACTS ANALYZED IN THE EIR AND <br /> DETERMINED TO BE SIGNIFICANT AND UNAVOIDABLE <br /> This section includes findings for project impacts which are determined to be significant even <br /> with the imposition of mitigation measures. These impacts cannot be mitigated to a less than <br /> significant level and therefore remain unavoidable. Although this Commission finds that all <br /> significant impacts of this project listed below cannot be substantially lessened or avoided by the <br /> imposition of mitigation measures or alternatives, the mitigation measures found in the EIR and <br /> listed below will be implemented to lessen the project's impact. Specific findings of this <br /> Commission for each impact are set forth below in this section. <br /> This section, together with Section G of the findings below, addresses the requirements in CEQA <br /> Guidelines Section 15093. CEQA requires the lead agency to balance the benefits of a proposed <br /> project against its unavoidable significant environmental impacts and to determine whether the <br /> impacts are acceptably overridden by the project benefits (outlined in Section F). As described <br /> herein,both project-level and cumulative unavoidable significant impacts would occur in the <br /> areas of Land Use,Noise and Air Quality. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.