Laserfiche WebLink
Magnify, No Foam A, Gramoxone Extra, Surflan A.S.,Bufferplus,Asana XL, Dipel DF, Nu- <br /> Film-P, TreflanHFP,Rovral fungicide, Buffercide, Kocide 101, Super 94, Rocket DL, Hasten <br /> spray adjuvant, Phostoxin, Silwet L-77, Buctril 4EC, Weedestroy AM-40 Amine salt, Rally <br /> 40W,New Century Buffer, Ammonium Sulfate, Supracide 25-W,MSO concentrate, Omite 6E, <br /> Britz B-85, Buccaneer, Orchard Star, Britz Silglow, and Weedar 64. In addition, there are above <br /> ground fuel tanks on the site that contain gasoline and diesel fuel. These are all farm tanks that <br /> are less than 500 gallons in size and are exempt from the permitting process with the County <br /> Environmental Health Department. The potential for water quality impacts due to the storage and <br /> use of hazardous materials would be significant under the No Project Alternative. (Draft EIR, p. <br /> 5-8.) <br /> Biological Resources <br /> Under the No Project Alternative, impacts to biological resources from existing agricultural <br /> activities could still occur. However, the potential for on-site impacts to biological resources <br /> under the No Project Alternative would be less than those associated with the project due to the <br /> lack of substantial physical changes to the site. (Draft EIR,p. 5-8.) <br /> Cultural Resources <br /> The No Project Alternative would allow continued agricultural use of the property. The potential <br /> for damage to archaeological and historic resources from deep excavations that could occur <br /> under the project would not occur. (Draft EIR,p. 5-8.) <br /> Hazards and Hazardous Materials <br /> Agricultural chemical use associated with the current agricultural practices on the site would <br /> continue under the No Project Alternative. As noted above under water quality,numerous <br /> agricultural chemicals are used onsite. In addition, there are above ground fuel tanks on the site <br /> that contain gasoline and diesel fuel. These are all farm tanks that are less than 500 gallons in <br /> size and are exempt from the permitting process with the County Environmental Health <br /> Department. The potential for water quality impacts due to the storage and use of hazardous <br /> materials would be significant under the No Project Alternative. (Draft EIR, pp. 5-8 to 5-9.) <br /> Visual Resources <br /> Under the No Project Alternative existing land use at the site would remain unchanged and <br /> continue to be orchards and field crops. Views of the Coastal Range from adjacent roadways and <br /> from surrounding lands would not be obstructed. Impacts to visual resources would be less than <br /> those associated with the project. (Draft EIR,p. 5-9.) <br /> Findings: <br /> Based on the whole record, this Commission finds that the No-Project Alternative results in no <br /> significant impacts because no mining operations at this site would occur. However, the No- <br /> Project Alternative would not meet the basic project objectives and would likely result in other <br /> mine site development with similar or additional environmental impacts; the Commission fends <br /> that the No-Project Alternative is economically and socially infeasible and is therefore rejected. <br /> 46 <br />