Laserfiche WebLink
Survey. As of January 1, 2006, the Stockton-Lodi P-C Region had permitted only 27% of its 50- <br /> year aggregate demand. (Susan L. Kohler, California Department of Conservation, Updated <br /> Aggregate Availability in California, Map Sheet 52, (2006),p.4.) Furthermore, aggregate <br /> reserves within the P-C Region fell 25%between 2001 and 2006. (Id.) The decline in local <br /> reserves is a pressing problem, especially given San Joaquin County's proposal to construct an <br /> interchange at Bird Road and SR 132. <br /> F.3. Maintain And Create Jobs <br /> The project would allow CEMEX to continue employing the current workforce at CEMEX's <br /> Kerlinger plant in Tracy. In addition to directly employing those workers,the Project would also <br /> create, maintain and/or support hundreds of jobs associated with the County's construction <br /> industry. <br /> F.4. Addition Of A Local Concrete And Asphalt Recycling Facility <br /> The project will provide for a concrete and asphalt recycling facility which will significantly <br /> reduce the consumption of new construction materials and allow the county to conserve its <br /> resources. <br /> F.S. Contribute A Significant Portion Of The Funding For The Bird Road/ SR <br /> 132 Interchange <br /> San Joaquin County's planned interchange at Bird Road and SR 132 will improve traffic and <br /> safety conditions for both the County and the region as a whole. Through an initial contribution <br /> and subsequent per ton fees, CEMEX would be a major contributor to the interchange's funding. <br /> Furthermore, approval of the CEMEX Vernalis Quarry Mining and Reclamation Project would <br /> allow construction materials for the interchange to be drawn, in part, from the newly permitted <br /> mine,thereby decreasing construction costs of the interchange and reducing the environmental <br /> impacts associated with hauling construction materials from further away. <br /> F.6. Tax Revenue <br /> Approval of the CEMEX Vernalis Quarry Mining and Reclamation Project would contribute <br /> substantial increased property and sales tax revenue to San Joaquin County. <br /> G. STATEMENT OF OVERRIDING CONSIDERATIONS <br /> This section of the findings addresses the requirements in CEQA Guidelines Sections <br /> 15091(a)(3) and 15093. It requires the lead agency to balance the benefits of a proposed project <br /> against its unavoidable significant impacts and to determine whether the impacts are acceptably <br /> overridden by the project benefits (outlined in Section F above). As described herein, both <br /> project-level and cumulative unavoidable significant impacts would occur in the Noise and Air <br /> Quality categories. <br /> The Commission finds that the previously stated benefits of the for the CEMEX Vernalis Quarry <br /> Mining and Reclamation Project as contained in the proposed action and described in section F, <br /> and described in the benefits letter from the applicant, outweigh the unavoidable significant <br /> adverse environmental impacts as discussed in Section D.3. The benefits of the Project, as cited <br /> 57 <br />