Laserfiche WebLink
Significance Significance <br /> Impact before after <br /> Mitigation Mitigation <br /> Hydrology and Water Quality: Groundwater seepage could cause Potentially Less than <br /> groundwater losses due to evaporation,threaten groundwater quality, Significant Significant <br /> and disrupt mining and future reuse operations. <br /> Hydrology and Water Quality:Accidental spill,leaks,or improper Potentially Less than <br /> disposal of petroleum fuel would increase the potential for Significant Significant <br /> degradation of groundwater quality over the life of the project. <br /> Hydrology and Water Quality:Excavation that disturbs and/or Potentially Less than <br /> truncates the existing groundwater well shafts on the project site could Significant Significant <br /> increase the potential for contaminants to enter and pollute the <br /> groundwater through the wells. <br /> Hydrology and Water Quality: Mining out Hospital Creek could ]Jg <br /> inificant Significant <br /> substantially alter the natural hydrology of Hospital Creek. <br /> Biological Resources:Project activities could potentially result in otentially Less than <br /> direct and indirect impacts to"waters of the U.S.". gnificant Significant <br /> Biological Resources:Project activities could result in adverse Potentially Less than <br /> impacts to special status-species covered under the SJMSCP. Significant Significant <br /> Cultural Resources: Damage to previously unidentified buried Potentially Less than <br /> archaeological retrains could occur during project construction. Significant Significant <br /> Cultural Resources:Damage to previously unidentified human Potentially Less than <br /> remains could occur during project construction. Significant Significant <br /> Hazards and Hazardous Materials: Existing and/or previously Potentially Less than <br /> unidentified contamination could be encountered during project Significant Significant <br /> activities. <br /> Hazards and Hazardous Materials:Accidental spill of a miscellaneous Potentially Less than <br /> hazardous substances used on site could pose both a hazard to Significant Significant <br /> construction employees as well as the environment <br /> Hazards and Hazardous Materials:Exposure of the existing and future Potentially Less than <br /> residents near the project area to potentially high levels of nuisance Significant Significant <br /> and disease vectoring mosquitoes from the addition of silt ponds and <br /> mining pits that could contain storm water on the project site would <br /> be a significant health hazard. <br /> Visual Resources: Implementation of the project has the potential to Potentially Less than <br /> conflict with adopted plans and policies relating to visual resources. Significant Significant <br /> Summary Of Cumulative Impacts <br /> The proposed project would result in significant and unavoidable cumulative impacts in the <br /> following areas: <br /> • Air Quality: The project will result in increased traffic volumes that in turn will cause an <br /> incremental effect on air quality that is cumulatively considerable when considered along <br /> with past,present, and future projects in the project area. The combined impact of those <br /> projects on air quality would be a significant impact. <br /> • Noise: Traffic noise levels resulting from the increase in traffic volumes associated with <br /> operation of the mine will be cumulatively considerable when considered along with past, <br /> present, and future projects in the project area,which will result in increased noise levels <br /> at residences located along truck haul routes. The cumulative impact would be <br /> significant. <br /> 3 <br /> Notice of DIER Availability <br />