Laserfiche WebLink
r r r F r r r r r r r r r r r r r r r <br /> 2.5 Summary of Environmental Impacts <br /> TABLE 2-1 <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> Land Use <br /> 4.2.1 The Proposed Project has the potential to conflict with 4.2.1 Implement Mitigation Measures 4.4.1a and b;4.4.2; Less than Significant <br /> existing and planned land uses surrounding the project 4.4.3;4.4.4;4.5.1 a,b,c and d;4.5.2;4.5.3;4.6.1;4.6.2; <br /> site.This would be a potentially significant impact.(PS) 4.6.4;and 4.12.2. <br /> 4.2.2 The project is consistent with applicable Land Use No mitigation is required. <br /> designations and policies.This would be a less-than- <br /> significant impact.(LS) <br /> 4.2.3 The Proposed Project could conflict with an applicable 4.2.3 Implement Mitigation Measures 4.9.2a—c. Less than Significant <br /> habitat conservation plan or natural community <br /> conservation plan.This would be a potentially significant <br /> impact.(PS) <br /> Agricultural Resources <br /> 4.3.1 Implementation of the Proposed Project would result in No mitigation is required. <br /> the disturbance of Prime Farmland and Farmland of <br /> Statewide Importance.This would be a less-than- <br /> significant impact.(LS) <br /> 4.3.2 The Proposed Project would not conflict with the current No mitigation is required. <br /> agricultural zoning of the subject properties nor with the <br /> provisions of an existing Williamson Act contract.This <br /> would be a less-than-significant impact.(LS) <br /> 4.3.3 Mining activities have the potential to result in offsite 4.3.3 Implement Mitigation Measure 4.6.1 to control the Less than Significant <br /> impacts to adjacent agricultural lands.This would be a generation of fugitive dust during mining activities <br /> potentially significant impact.(PS) Vineyards in the project and haul route vicinity would <br /> potentially be adversely affected by fugitive dust from <br /> project operations.A literature review has found that <br /> spider mite population increases in vineyards could be <br /> associated with increased dust levels(Costello,2004; <br /> Lodi-Woodbridge Winegrape Commission,2002).Dust <br /> control measures incorporated at the project site and haul <br /> routes to reduce the total PM 10 to below the CAAOS <br /> would also reduce project related dust fallout on nearby <br /> vineyards. <br /> RMC Parc Vernalis Quarry Mining and Reclamation Project 2-5 ESA I Project No.203015 <br /> Draft Environmental Impact Report May 2006 <br />