My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> 4.7.3 Permanent reclamation slopes could be subjected to No mitigation is required. <br /> excessive soil erosion,resulting in rifling,gullying,debris <br /> flows,and berm damage.This would be a less-than- <br /> significant impact given the project's erosion control plan. <br /> (LS) <br /> 4.7.4 In the event of a major earthquake,seismic ground 4.7.4 Earthquake Preparedness and Response Plan.Prior to Less than Significant <br /> shaking could potentially injure people and rause commencement of mining,the applicant staff shall <br /> collapse or structural damage to proposed structures. complete an Earthquake Preparedness and Response <br /> This would be a potentially significant impact.(PS) Plan(EPRP)to address worker safety and plant <br /> operation status during and following a major earthquake. <br /> The EPRP shall be included or become a supplementary <br /> document to the standard site health and safety plan.The <br /> EPRP shall be prepared,implemented,and self- <br /> monitored by the applicant.The EPRP shall include pre- <br /> earthquake and post-earthquake preparedness <br /> requirements for the facility that include: <br /> • Emergency evacuation routes to clear people of <br /> unsafe equipment and buildings, <br /> • Requirements for securing equipment likely to topple <br /> or undergo severe damage during an earthquake <br /> including procedures to avoid topple of furniture and <br /> small equipment, <br /> • Communication protocol during and following an <br /> earthquake, <br /> • Location of emergency equipment and first aid, <br /> • Transportation routes, <br /> • List of on-site contacts, <br /> • Procedures to locate and account for on-site <br /> personnel, <br /> • List of current phone numbers for San Joaquin County <br /> sheriff and fire prevention,and City of Tracy Fire and <br /> Rescue,and <br /> • Post-earthquake facility structure and quarry pit <br /> inspections. <br /> RMC Pacific Vamalis Quarry Mining and ReNamation Pmject 2-14 ESA/Project No.203015 <br /> orae EnNrcnmental Impact RepM May 2000 <br /> i_ ( I I I I I - I L L I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.