2.Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> Regional Water Quality Control Board,or the San in conjunction with or prior to continued project <br /> Joaquin County Environmental Health Department. construction and/or mining activities. <br /> Encountering contaminated soil,surface water,and <br /> groundwater without taking proper precautions could <br /> result in the exposure of construction workers and <br /> consequently result in associated significant adverse <br /> human health and environmental impacts.This would be <br /> a potentially significant impact.(PS) <br /> 4.11.2 During excavation,grading,and construction activities of 4.11.2 The project applicant shall ensure that all contractors and Less than Significant <br /> the proposed facilities,it is anticipated that limited employees immediately control the source of any leak - <br /> quantifies of miscellaneous hazardous substances,such and immediately contain any spill utilizing appropriate <br /> as gasoline,diesel fuel,hydraulic fluid,solvents,oils,etc. spill containment and countermeasures.If required by <br /> would be brought onto the site.In addition,the proposed any regulatory agency,contaminated media shall be <br /> project operations will include the use of fuels and other collected and disposed of at an offsite facility approved to <br /> hazardous materials.As with any liquid and solid,during accept such media. In addition,all precautions required <br /> handling and transfer from one container to another,the by the RWQCB issued NPDES construction activity storm <br /> potential for an accidental release exists.Depending on water permits would be taken to ensure that no <br /> the relative hazard of the material,if a spill were to occur hazardous materials enter any nearby waterways. <br /> of significant quantity,the accidental release could pose <br /> both a hazard to construction employees as well as the <br /> environment.This would be a potentially significant <br /> impact.(PS) <br /> 4.11.3 The project would involve the installation and use of No mitigation is required. <br /> above-ground fuel storage tanks,and the storage and <br /> use of solid waste and hazardous materials.This would <br /> be a less-than-significant impact.(LS) <br /> 4.11.4 Exposure of the existing and future residents near the 4.11.4 The silt ponds and the mining pits proposed as a part of Less than Significant <br /> project area to potentially high levels of nuisance and the project should be properly designed and maintained <br /> disease vectoring mosquitoes from the addition of silt so that they do not breed mosquitoes.The design and <br /> ponds and mining pits that could contain storm water on maintenance of the basins should be done in consultation <br /> the project site would be a significant health hazard. with the San Joaquin County Mosquito Abatement District <br /> Mosquitoes are vectors of diseases such as malaria, and the East Side Mosquito Abatement District in <br /> encephalitis,West Nile virus,and canine heartworm Stanislaus County. <br /> disease.This would be a potentially significant impact. <br /> (PS) <br /> 4.11.5 Records maintained at the San Joaquin County No mitigation is required. <br /> Agricultural Commissioner show that restricted pesticides <br /> RMC Parc Vemalm Quarry Mining and Reclamation Project 2-25 ESA/Project No 203015 <br /> Draft Environmental Impact Report May 2006 <br />