5.Mitigation Monitoring and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> • List of on-site contacts, <br /> • Procedures to locate and account for on-site personnel, <br /> • List of current phone numbers for San Joaquin County sheriff and fire prevention,and City of <br /> Tracy Fire and Rescue,and <br /> • Post-earthquake facility structure and quarry pit inspections. <br /> The EPRP shall be provided to all employees and a copy shall be provided to local fire and rescue <br /> departments as well as to the facility file at the County of San Joaquin Community Development <br /> Department, The applicant shall update and redistribute when information changes or revisions are <br /> necessary. <br /> 4.8 HYDROLOGY AND WATER QUALITY .j x k <p. ". �,KZ '. l; ,n <br /> 4.8.1a: Excavation/Groundwater Separation.The project applicant,shall,at no time,extend the Applicant RWQCB Ongoing <br /> depth of excavation below the depth of the water table and shall maintain a vertical separation <br /> between the water table and the active mining surface. Determination of the water table depth shall <br /> be based on historic regional groundwater levels for the unconfined aquifer. The vertical separation <br /> shall be determined appropriate by a California-certified hydrogeologist or civil engineer but shall not <br /> be less than five feet.. <br /> 4.8.1b:Groundwater Elevation Monitoring Schedule.The applicant shall monitor groundwater to Applicant RWQCB October—April: <br /> ensure that the vertical separation between the nearest groundwater surface and the lowest point of Bimonthly and <br /> the active excavation and reclaimed phases is maintained as required by the California-certified within a week of a <br /> hydrogeologisl and at no less than five feet. The groundwater levels shall be monitored on-site prior major rain event. <br /> to and during all phases of excavation, prior to the initiation of excavation for each phase,and in the May—September: <br /> reclaimed phases. Groundwater shall be continually monitored in the active mining area on a Monthly. <br /> bimonthly basis,within a week following each large rainstorm from October through April,and Reclaimed Phases: <br /> monthly during the remainder of the year. Reclaimed phases shall be monitored once monthly, Monthly <br /> Monitoring technique shall be based on recommendations and approval by a California-certified <br /> hydrogeologist <br /> 4.8.3: Prior to the commencement of excavations,the project applicant shall conduct a Applicant Health Department Prior to Phase I <br /> comprehensive well survey to locate,identify,and confirm all existing groundwater wells on the (San Joaquin or (improvement plan <br /> project site.Information for well locations shall be obtained, if available,from DWR,San Joaquin Stanislaus,as approval or mining <br /> County Environmental Health Department,Stanislaus County,and the former property owners. appropriate) activity,whichever <br /> Groundwater wells that will not remain In operation shall be properly destroyed and removed in occurs first) <br /> Cemex Vernalis Quarry Mining and Redamallon Project 5-7 ESP 1203015 <br /> Final Environmental Impact Repon June 2000 <br />