Laserfiche WebLink
CHAPTER 4 <br /> Environmental Analysis <br /> 4.1 Introduction to the Analysis <br /> The following sections(4.2 through 4.12) of this Draft Environmental Impact Report(EIR) <br /> ` provide a discussion of the existing setting,potential environmental impacts,and proposed <br /> mitigation measures.The potential effects of implementing the Proposed Project are identified, <br /> along with mitigation measures recommended to lessen or reduce identified impacts. In cases <br /> 6. where no mitigation is feasible, this fact is noted. <br /> 4.1 .1 Significance of Environmental Impacts <br /> Whenever possible and reasonable, significance criteria are established that serve as the bench <br /> mark for determining impacts. Significance criteria are identified for each environmental category <br /> to determine if the project will result in a significant environmental impact when evaluated <br /> against the environmental setting(baseline conditions). The significance criteria vary depending <br /> 6, on the environmental category. In general,effects can be either significant(above the threshold) <br /> or less than significant(below the threshold). <br /> 4.1 .2 Setting, Impacts, and Mitigation Measures <br /> ` Pursuant to CEQA Guidelines Section 15125, an EIR must include a description of the physical <br /> environmental conditions in the vicinity of the project,as they exist at the time the notice of <br /> preparation(NOP) is published. The environmental setting will normally constitute the baseline <br /> physical conditions by which a lead agency determines whether an impact is significant. The <br /> setting is presented from site,local,and/or regional perspectives, as appropriate to each <br /> environmental topic. According to the CEQA Guidelines,the effects of the project are defined as <br /> 11n changes to the environmental setting that are attributable to the project. <br /> In describing the relative significance of project impacts,each impact is identified to be <br /> potentially significant, significant,cumulatively significant, significant unavoidable, less than <br /> significant,or beneficial. The cumulative impact analysis in this EIR is based on the <br /> implementation of the proposed project as well as approved and anticipated development in the <br /> L region. A summary of cumulative impacts is provided in Chapter 6,Other Statutory <br /> Considerations. <br /> L <br /> V. RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.1-1 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> r <br />