My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.4 Transportation and Circulation <br /> 4.4 Traffic and Circulation' <br /> 4.4.1 Introduction <br /> _ The analysis presented herein addresses potential project impacts on traffic operating conditions <br /> at area intersections and on area roadways,on traffic safety,and on roadway structural integrity. <br /> The analysis focused on AM peak-hour conditions because project-generated traffic would be <br /> substantially lower during the PM peak hour(which generally occurs between 4:00 PM and <br /> 6:00 PM).In addition, 24-hour machine counts performed on area roadways indicates that truck <br /> traffic originating from the existing mining sites in the project area is negligible during the PM <br /> peak hour relative to the AM peak-hour volumes. <br /> The traffic study initially addressed two potential haul routes (Haul Route 1 and Haul Route 2). A <br /> third haul route(Haul Routs 3)was also considered and has been addressed in an addendum to <br /> the original traffic study,found in Appendix C,Part iii of this EIR. <br /> 4.4.2 Setting <br /> Roadway Network <br /> The project area is predominately served by two-lane rural roads. These roadways are typically <br /> unimproved and lack curbs and sidewalks.The 680-acre project site is located southeast of the <br /> intersection of Blewett and Koster Roads. A number of other sand and gravel quarries exist in the <br /> vicinity of the site, and each of these operations is identified in Section 6.2 of this report. The <br /> traffic resulting from existing and permitted gravel mining traffic was considered in all analysis <br /> scenarios. Figure 4.4-1 shows the roadway network in the project vicinity. <br /> Regional Roadway Access <br /> Regional access to the project site is provided by Interstate 5 (I-5),I-580,and State Route <br /> ` (SR) 132. I-5 is a four-lane freeway that runs north-south on the west side of the area,connecting <br /> with the cities of Tracy and Stockton to the north and with Merced County to the south. The <br /> freeway interchange at SR 132 serves the project site. Average Daily Traffic (ADT)on I-5 is <br /> approximately 16,000 vehicles near the SR 132 interchange(Caltrans Traffic Data Unit,2002). <br /> I-5 intersects with 1-580 just west of the project site, with I-580 providing regional access to <br /> points west in the San Francisco Bay Area. I-580 has four lanes and carries an ADT of <br /> approximately 22,000 vehicles in the project vicinity(Caltrans Traffic Data Unit,2002). SR 132 <br /> is a two-lane east-west highway,providing access to the City of Modesto to the east;SR 132 <br /> connects with I-5 and I-580 at freeway interchanges northwest of the project site. Short sections <br /> 6' of SR 132 near its interchanges with I-5 and I-580 are constructed as a four-lane divided <br /> t This section was prepared using,in part,an analysis conducted by Peters Engineering Group,presented in a March <br /> 2004 report. <br /> r <br /> RMC Pacific Vemalis Quarry Mining and Reclamation Project 4.4-1 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.