Laserfiche WebLink
4.Environmental Analysis — <br /> The two more southerly residences (residences RI and R2)located southwest of Phase V(also — <br /> across the Delta-Mendota Canal) would experience noise generated by mining activity,at a <br /> distance of about 800 feet. At this distance,mining noise would attenuate to 67 dBA L,,by <br /> distance alone, and substantial earthen berms on both sides of the Delta-Mendota Canal already <br /> block the line of sight from these residences to the location of the mining. When considering the <br /> attenuation from both distance and the earthen berms,the noise levels at these residences would <br /> be approximately 55 dBA from the closest mining activity in Phase V.Assuming the ambient — <br /> noise environment at residences RI and R2 is similar to that at residence R3, this would also be a <br /> significant impact. At residences R1, R2,and R3, noise levels would be significant because — <br /> project mining activities would increase noise levels by more than 3 dBA and the resulting noise <br /> levels from the stationary sources would exceed the daytime L,noise daytime standard(50 dBA) <br /> and the Lw nighttime standard (45 dBA) in the San Joaquin County Development Title. _ <br /> At residences RI -R5,the impact of the noise levels resulting from the project would lessen as <br /> post-stripping activities and excavation continue at lower depths;however, haul trips on-site <br /> would continue to generate noise at the surface. <br /> Mitigation Measures <br /> Measure 4.5.1a: At the start of stripping operations for each phase,the applicant shall <br /> construct an earthen berm along the portions of the project site that face sensitive receptors <br /> located within 2,000 feet of mining operations for that phase. This includes residences R4 <br /> and R5 northeast of Phase IV (this earthen berm would also attenuate noise to residences <br /> R5, R6,and R7) and residences RI, R2, and R3, west of Phase III and southwest of Phase <br /> V. The sound barriers must be at sufficient height(approximately 10 feet)to block the line <br /> of sight to the nearest sensitive receptor. If continuous earthen berms of adequate height are <br /> already in place,additional berms would not be needed. <br /> Mitigation Measure 4.5.1b: The Applicant shall conduct additional noise measurements — <br /> after the completion of initial stripping activities to evaluate the effectiveness of Mitigation <br /> Measure 4.5.1a in reducing resultant sound levels at outdoor activity areas of nearby — <br /> sensitive receptors. For those residences requiring additional sound reduction,the <br /> Applicant shall fund the construction of solid(masonry or similar construction) walls along <br /> those property lines of the residences facing the project site, if desired and allowed by the <br /> subject property owners. — <br /> Mitigation Measure 4.5.1c: For any residences that would exceed a noise level of <br /> 45 dBA,L2 indoors,the applicant shall upgrade house noise reduction via window and — <br /> door upgrades on the side of the houses facing the mine, if the landowner desires and <br /> allows the work to be done. <br /> Mitigation Measure 4.5.1d: Nighttime mining shall be prohibited within 1,000 feet of <br /> residences unless noise measurements confirm that noise levels are below 45 dBA,L.,at <br /> the outdoor activity areas of adjacent residences. <br /> The earthen berms constructed pursuant to Mitigation Measure 4.5.1a could reduce noise <br /> levels up to 10 dBA.The resulting maximum exterior noise levels are estimated to be <br /> 69 dBA Lw(79 - 10)at Residences R4 and R5 immediately to the northeast. The resulting, — <br /> maximum exterior noise levels are estimated to be 52 dBA L.(62- 10)at residences R6, <br /> R7, and R8 farther to the northeast of Phase IV. The resulting, maximum exterior noise <br /> RMC Pacific Vernalis Quant'Mining and Reclamation Project4.5-_f6__ ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />