Laserfiche WebLink
4.7 Geology,Soils,and Seismicity <br /> f� <br /> (g) Replacement of Topsoil. In agricultural areas,the topsoil shall be set aside, and upon <br /> completion of an excavation,the topsoil shall be replaced and the site leveled in <br /> conformance with the excavation permit. This requirement may be waived if the property is <br /> to be rehabilitated for a use other than agriculture which is consistent with the General <br /> Plan, or if a soils report indicates the replacement of the topsoil will not enhance the <br /> ` agricultural suitability of the property. In such cases, the topsoil may be removed from the <br /> site. <br /> (j) Setbacks. No excavation shall take place within twenty-five(25)feet of any property line <br /> or right-of-way (nor within the allowed slopes adjacent to said twenty-five(25)foot <br /> setback),unless the elevation prior to excavation is more than that of the abutting property, <br /> in which case the elevation within said twenty-five(25) foot setback shall at no time be less <br /> than that of the abutting property,at the property line. <br /> (k) Slopes. The following provisions do not apply to temporary interior cut slopes(i.e., <br /> working slopes that do not fall within any of the criteria listed below). Temporary interior <br /> cut slopes shall comply with the Cal OSHA Code of Regulations and/or the Federal OSHA <br /> Code of Regulations as applicable. <br /> (1) Terracing Required. All slopes over fifty (50) feet in height shall be terraced with a <br /> maximum vertical distance between terraces of fifty (50) feet. Each terrace or bench <br /> ` shall be a minimum of twelve(12) feet wide. <br /> (2) Terrace Drainage. Drainage plans with calculations shall be submitted for approval to <br /> Development Services Division for all terraces as part of the Reclamation Plan. <br /> V <br /> Terraces for reclaimed final slopes shall he sloped back towards the fill and be <br /> designed such that runoff is directed to collection points where it can enter catch <br /> basins and be conveyed via pipes or other acceptable conveyance to the toe of slope. <br /> The spacing of collection points shall be no greater than 1,500 feet, with each <br /> reclaimed final slope face that has terracing shall have a minimum of one(1)down <br /> drain.The method of transporting the water along the flow line of the terrace to the <br /> ` down drain, so as to prevent erosion and possible slope failure, shall be approved by <br /> the Development Services Division. <br /> The method of drainage of terraces for temporary slopes at setback lines shall be <br /> submitted to Development Services division for approval. <br /> 6. (3) Slope Modification Requirement. The Review Authority may require slopes flatter <br /> than those specified below for safety or aesthetic purposes if the proximity of <br /> residential and other urban uses, waterways or roads,the instability of materials, or <br /> the surrounding terrain so warrants. <br /> r <br /> If after one(1)year or more of extraction the approved slope does not remain stable, <br /> the Review Authority shall have the authority to reduce the slope or require other <br /> appropriate measures in the immediate area and other areas as deemed necessary in <br /> order to correct the condition as well as require the operator to correct the <br /> deteriorated slope. <br /> ` (4) Slope Stability Factors of Safety. When required in this Title to provide site-specific <br /> geologic and engineering slope stability analysis,the following minimum slope <br /> stability factors of safety shall apply: <br /> (A) A minimum factor of safety of 1.5 against static deep seated failure. <br /> •. RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.7-13 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> r <br />