My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.7 Geology,Soils,and Seismicity <br /> V <br /> structural damage and depending on the foundation type, some equipment could topple. Internal <br /> haul roads may also undergo localized failure during an earthquake. Equipment damage could <br /> injure site workers and visitors to the quarry. <br /> 6. Avoiding earthquake damage to the processing plant equipment, the batch plant, associated <br /> portable offices, and other related equipment depends on the structural stability and the <br /> performance of these structures during strong ground shaking. The design and construction of <br /> certain buildings may require conformance with seismic design criteria set forth by the California <br /> Building Code(CBC) while other structures are considered portable,temporary structures or <br /> ` processing equipment may not be subject to the CBC seismic design criteria. <br /> Earthquakes are unavoidable and although infrequent,could at some time during the life of the <br /> ` project,cause worker injury and equipment damage. Structures related to quarry operations that <br /> are required to comply with the CBC seismic design criteria for this area would likely experience <br /> minor damage and remain stable. Other equipment, such as portable offices or temporary <br /> processing equipment could cause injury if substantially damaged during ground shaking. <br /> However,although some structural damage may occur,the overall risk to workers is considered <br /> low because if an earthquake was to occur during working hours, many of the 40 employees on <br /> 6. the site would be operating equipment or be within structures that could withstand ground <br /> shaking. Regardless, the following mitigation measure would further ensure that adverse impacts <br /> associated with earthquake ground shaking be less than significant. <br /> Mitigation Measures <br /> Measure 4.7.4: Earthquake Preparedness and Response Plan. Prior to commencement of <br /> mining,the applicant staff shall complete an Earthquake Preparedness and Response Plan <br /> (EPRP) to address worker safety and plant operation status during and following a major <br /> earthquake. The EPRP shall be included or become a supplementary document to the <br /> standard site health and safety plan. The EPRP shall be prepared, implemented,and self- <br /> monitored by the applicant. The EPRP shall include pre-earthquake and post-earthquake <br /> ` preparedness requirements for the facility that include: <br /> • Emergency evacuation routes to clear people of unsafe equipment and buildings, <br /> • Requirements for securing equipment likely to topple or undergo severe damage <br /> during an earthquake including procedures to avoid topple of furniture and small <br /> equipment, <br /> r <br /> • Communication protocol during and following an earthquake, <br /> • Location of emergency equipment and first aid, <br /> • Transportation routes, <br /> • List of onsite contacts, <br /> • Procedures to locate and account for onsite personnel, <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.7-23 ESA/203015 <br /> Drat[Environmental Impact Report May 2006 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.