My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8 Hydrology and Water Quality <br /> 4.8 Hydrology and Water Quality <br /> 4.8.1 Introduction <br /> This chapter describes the hydrologic and water quality characteristics of surface water and <br /> groundwater resources on and near the proposed project site and focuses on the effect that a large <br /> ` aggregate quarry operation and its eventual reclamation would have on those resources. The <br /> setting portion of this chapter presents existing conditions by describing the climate, surface <br /> water and groundwater conditions, and water quality issues.The Regulatory Background section <br /> describes the pertinent federal, state, and local laws related to the hydrology and water quality of <br /> a surface mining operation. The Impacts and Mitigations section defines the significance criteria, <br /> presents discussion of the impacts, and where necessary,applicable mitigation measures. <br /> 4.8.2 Setting <br /> Surface Water Hydrology <br /> ` The San Joaquin Valley has hot, dry summers and relatively mild winters. The average annual <br /> rainfall ranges from 5 to 16 inches, with most of the rainfall occurring from November through <br /> April. The average annual rainfall is approximately 10 inches at the proposed project site and <br /> increases to 12 inches in the contributing watersheds to the west. The most intense 1-day storm, <br /> referred to as the 100-year storm, is estimated at approximately three inches (NOAA, 1973).1 As <br /> ` a comparison, the 100-year, 24-hour precipitation event for the city of Sacramento is over four <br /> inches of rainfall. <br /> r The Sacramento/San Joaquin Valley is a broad structural basin bordered by the Sierra Nevada on <br /> the east and the Coast Ranges on the west. The northern portion of the San Joaquin Valley drains <br /> toward the Delta by the San Joaquin River and its tributaries, the Fresno,Merced,Tuolumne,and <br /> r Stanislaus Rivers. The southern portion of the valley is internally drained by the Kings, Kaweah, <br /> Tule, and Kem Rivers that flow into the Tulare drainage basin that includes the former Tulare, <br /> Buena Vista, and Kem Lakes. <br /> The 688-acre proposed project site is situated on the Hospital Bar alluvial fan, located along the <br /> western margin of the San Joaquin Valley. Surface drainage flows eastward toward the valley <br /> floor but some natural flows infiltrate into the ground prior to reaching the San Joaquin River, <br /> The Lone Tree Creek watershed, Hospital Creek watershed,and Ingram Creek watershed <br /> contribute surface water flows to the project site and adjacent areas. Average annual runoff <br /> estimates for these watersheds are presented in Table 4.8-1. Surface water flows near the project <br /> site fluctuate seasonally, with precipitation and decreased evaporation in winter, and little to no <br /> rainfall and increased evaporation in summer and fall. Due to the small amount of annual rainfall <br /> 1 The 100-year storm event is the event that has a 1 percent chance of being equaled or exceeded in any given year. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.8-1 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.