Laserfiche WebLink
5.Alternatives <br /> TABLE 5-1 (CONTINUED) <br /> COMPARISON MATRIX OF THE PROJECT ALTERNATIVES <br /> Alternative 2 Alternative 2 <br /> Alternative 1 (Reduced Project (Reduced Project Alternative 3 <br /> (No Project Production) Production) (Off-Site Proposed <br /> Alternative) Scenario 1 Scenario 2 Alternative) Project <br /> Impacts to special status species covered under the SJMSCP PS PS PS- PS PS <br /> Conflict with any applicable habitat conservation plan or natural community LS LS LS LS LS <br /> conservation plan <br /> Have a substantial adverse effect on any riparian habitat or other sensitive LS LS LS LS LS <br /> natural community <br /> Interfere substantially with the movement of any native resident or migratory fish LS LS LS LS LS <br /> or wildlife species or with established native resident or migratory wildlife <br /> corridors,or impede the use of native wildlife nursery sites <br /> .Conflict with any local policies or ordinances protecting biological resources LS LS LS LS LS <br /> Cultural Resources <br /> Damage to previously unidentified buried archaeological remains during project LS PS PS PS PS <br /> construction <br /> Damage to previously unidentified human remains during project construction LS PS PS PS PS <br /> Hazards and Hazardous Materials <br /> Encounter unknown hazardous conditions LS PS PS PS PS <br /> Construction related releases of hazardous materials LS PS PS PS PS <br /> Aboveground fuel storage tank installation/Hazardous Materials PS LS LS LS LS <br /> Exposure to disease vectoring mosquitoes LS PS PS PS PS <br /> Restricted pesticide use PS LS LS LS LS <br /> Exposure to asbestos and lead-based paint LS LS LS LS LS <br /> Visual Resources <br /> Adversely impact scenic views of the Coastal Range Mountains and San LS LS LS LS LS <br /> Joaquin Valley <br /> Conflict with adopted plans and policies LS LS LS LS LS <br /> SOURCE: ESA,2003 <br /> Key: <br /> LS=Less-than-Significant(No Mitigation Required) .=Greater in magnitude <br /> PS=Potentially Significant(Mitigation Identified to Reduce Impacts) -=Lesser in magnitude <br /> S=Significant(No Mitigation Available) <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 5-24 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> 1 1 1 1 1 j I ( <br />