Laserfiche WebLink
6 Cumulative Impacts <br /> TABLE 6-1 <br /> SURROUNDING PROPOSED AND APPROVED PROJECTS <br /> Mine IDX Name of Project Acreage Location Description of Projecr Status <br /> 91-39- Granite 260 30909 South Tracy Tracy Plant(91-39-0008)25 Currently <br /> 000891- Construction Blvd.south of Linne million tons of sand and operating <br /> 39-0009 Tracy Plant Road gravel over 20 years. <br /> 91-39- RME Pit(91-39-0009)4 mcy <br /> 0032 of sand and gravel over 6 <br /> years.McGah&Peterson <br /> (91-39-0032)6.6 million ton <br /> (4.4 mcy)over 6 years equals <br /> 1.1 mty starting in 1999(91- <br /> 39-0032)(per county staff <br /> report) <br /> 91-39- RMC Pacific 265 Between Tracy Blvd. 23 mcy from a 265 acres site. Currently <br /> 0015 Materials Tracy and Mac Arthur, The entire site contains 548 operating <br /> Plant(Keriinger/ south of Linne Road acres in three phases. <br /> Rhodes) <br /> 91-39- RMC Pacific 160 South of Unne Road 16 mcy of aggregate Currently <br /> D014 Materials Huck and east of Corral operating <br /> Property Hollow Road <br /> mcy=million cubic yards:mty=million tons per year <br /> SOURCE: Draft EIR for Teichert Aggregates,Inc.,1992.Draft EIR for Granite Construction Company,1993,Final EIR for Brown Sand <br /> and Gravel,1997.Final EIR for DSS Engineering Contractors Koster Road Quarry,1997.Sen Joaquin County Community <br /> Development Department,2004. <br /> are located and where the effects resulting from the project could contribute to the cumulative <br /> environmental impacts.There are no other types of projects, such as large residential,commercial <br /> or industrial development in the area. <br /> 6.2.3 Other Approved or Pending Projects <br /> The information provided in Table 6-1 describes other projects within the project vicinity that are <br /> currently operating,undergoing construction,have been recently approved,or are pending <br /> approval, and are therefore considered in the cumulative analysis in this EIR. Figure 6-1 shows <br /> the locations of the other projects in the Vernalis and Tracy area.Figure 6-2 shows detailed <br /> locations of the other projects in the Vernalis area that are close to the project site. <br /> Note that since the publication of the NOP on December 23, 2002,some of these projects may <br /> ` have changed or applications may have been submitted for new projects.The analysis for the <br /> project in this document considers only those projects listed above as defined at the time of the <br /> publication of the NOP as required by CEQA. <br /> 6.2.4 Cumulative Impacts <br /> The following provides a discussion of cumulative impacts related to the project by <br /> environmental topic. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 6-5 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />