Laserfiche WebLink
Alternative 4: No_Project <br /> This alternative would not result in PM,, and ozone precursor emissions and would not <br /> affect the eventual attainment of the state and.federal PM,o and ozone standards within the <br /> SJVUAPCD. Therefore, no adverse impact to cumulative air quality within the SJVAB <br /> would result from this alternative. <br /> Mitigation Measure 4.5-5a (Alternatives 1, 2, and 3) <br /> Implement project specific mitigation measures. <br /> Level-of Significance After Mitigation: <br /> Implementation of Mitigation Measures 4.5-1a, 4.5-2a, 4.5-2b, and 4.5-2c, would <br /> help to reduce the severity of cumulative air quality impacts. However, significant <br /> unavoidable adverse cumulative impacts would remain. Therefore the cumulative <br /> air quality impact of Alternatives 1, 2 and 3 would be significant and unavoidable. <br /> I <br /> I <br /> I <br /> i <br /> Draft Environmental Impact Report 4-82 ER-96-3 <br />