Laserfiche WebLink
• The primary or secondary impacts of the project would generally commit future <br /> generations to similar uses. <br /> • ..The project involves uses from which irreversible damage could result due to <br /> project. <br /> potential environmental accidents associated with the <br /> P <br />�r <br /> This section also states that irretrievable commitments of resources should be evaluated <br /> to ensure that current consumption is justified. <br /> k Implementation of the project alternatives would result in increased short-term production <br /> from the project site in the form of aggregate resources. Short-term agricultural <br /> productivity would be eliminated, but would be reestablished to agriculture and other open <br /> space uses after completion of the project and reclamation of the mined lands. <br /> Implementation of the project alternatives would require the irreversible commitment of <br /> natural resources, because the project would permit mining and processing of minerals that <br /> would not be replenished within normal planning horizons, and would decrease the <br /> availability of aggregate resources in the future. <br /> Implementation'of the proposed'project would contribute to the permanent conversion of <br /> agricultural land to non-agricultural uses within the County. The mining project over the <br /> next 56 years would result in the conversion of 54 acres of agricultural land to non- <br /> agricultural uses (i.e., pit walls and haul roads). <br /> The project alternatives would result in the irretrievable commitment of energy resources <br /> (primarily in the form of fossil fuels, including fuel oil, natural gas, and gasoline for <br /> automobiles, trucks, and construction equipment) to fuel mining, processing, and <br /> subsequent reclamation activities. <br /> I <br /> 5.3 IDENTIFICATION OF ENVIRONMENTALLY <br /> SUPERIOR ALTERNATIVE <br /> i <br /> 4" <br /> Section 15126(4)(4) of the CEQA Guidelines requires that an EIR identify an <br /> environmentally superior alternative. If that alternative is the No Project alternative, then <br /> the EIR must also identify an environmentally superior project alternative. <br /> Environmentally Superior Alternative <br /> Based on the environmental impact analysis provided in Chapter 4.0, Alternative 4 (No r <br /> Project) is the environmentally. superior alternative. As described in Chapter 3.0, <br /> Alternative 4 assumes that existing land uses at the project site would continue and no <br /> mining or processing of aggregate materials would occur. As a result, the impacts <br /> associated with mining operations, such as traffic, noise, and air quality, would not occur. <br /> Therefore, Alternative 4 would be environmentally superior to the other alternatives. <br /> i <br /> Draft Environmental Impact Report 5-3 ER-96-3 <br /> VF <br />