Laserfiche WebLink
(6) Temporary stream or watershed diversions. characteristics, and climate of the mined areas shall be <br /> (c) Adequacy. In judging the adequacy of a particular used. <br /> reclamation plan in meeting the requirements described NOTE: Authority cited: Section 2755, Public Resources <br /> herein and within the Act, the lead agency shall consider Code. Reference: Sections 2756 and 2757, Public <br /> the physical and land-use characteristics of the mined Resources Code. <br /> lands and their surrounding area pursuant to Public § 3504. Administration by Lead Agency. <br /> Resources Code Section 2773. (a) Record Keeping. The lead agency shall establish <br /> NOTE: Authority cited: Section 2755, Public Resources and maintain inhouse measures and procedures to ensure <br /> Code.Reference:Sections 2712(a)—(c),2756-2757,2770 organized record-keeping and monitoring of surface mining <br /> and 2772-2773, Public Resources Code. reclamation under its jurisdiction. The lead agency shall <br /> § 3503. Surface Mining and Reclamation Practice. forward a copy of each permit and approved reclamation <br /> The following are minimum acceptable practices to be plan to the California Division of Mines and Geology <br /> followed in surface mining operations: (Sacramento). <br /> (a) Soil Erosion Control. (b) Performance Assurances. The lead agency shall <br /> (1) The removal of vegetation and overburden, if any, ensure that the objectives of the reclamation plan will be 1 J. <br /> in advance of surface mining shall be kept to the attained. This may include provisions for liens, surety <br /> minimum. bonds or other security, to guarantee the reclamation in <br /> (2) Stockpiles of overburden and minerals shall be accordance with the approved reclamation plan. <br /> managed to minimize water and wind erosion. NOTE: Authority cited: Section 2755, Public Resources <br /> (3) Erosion control facilities such as retarding basins, Code. Reference: Sections 2757, 2758(b), 2774(a) and <br /> ditches,. streambank stabilization, and diking shall be 2776, Public Resources Code. <br /> constructed and maintained where necessary to control § 3505. Special Provisions. <br /> erosion. (a) Exemptions. In addition to the provisions of Public <br /> (b) Water Quality and Watershed Control. Resources Code Section 2714(a), (c) and (d), any surface <br /> (1) Settling ponds or basins shall be constructed to mining operation that does not involve either the removal f 1 <br /> prevent potential sedimentation of streams at operations of a total of more than 1000 cubic yards of minerals, ores, <br /> where they will provide a significant benefit to water and overburden, or involve more than one acre in any one <br /> quality. location, shall be exempt from the provisions of the Act. <br /> (2) Operations shall be conducted to substantially (b) Vested Rights. The permit and reclamation plan <br /> prevent siltation of ground-water recharge areas, requirements for persons with vested rights are stated in <br /> (c) Protection of Fish and Wildlife Habitat. All Public Resources Code Section 2776. <br /> reasonable measures shall be taken to protect the habitat Where a person with vested rights continues surface <br /> of fish and wildlife. mining in the same area subsequent to January 1, 1976, <br /> (d) Disposal of Mine Waste Rock and Overburden. he shall obtain an approval of a reclamation plan covering <br /> Permanent piles or dumps of mine waste rock and the mined lands disturbed by such subsequent surface <br /> overburden shall be stable and shall not restrict the natural mining. In those cases where an overlap exists (in the <br /> drainage without suitable provisions for diversion. horizontal and/or vertical sense) between pre- and post- <br /> e) Erosion and Drainage. Grading and revegetation Act mining, the reclamation plan shall call for reclamation <br /> shall be designed to minimize erosion and to convey proportional to that disturbance caused by the mining after <br /> surface runoff to natural drainage courses or interior the effective date of the Act. <br /> basins designed for water storage. Basins that will store NOTE:Authority cited:Sections 2714(d)and 2755,Public <br /> water during periods of surface runoff shall be designed to Resources Code. Reference: Sections 2714, 2758(c) and <br /> prevent erosion of spillways when these basins have 2776, Public Resources Code, <br /> outlet to lower ground. <br /> (f) Resoiling. When the reclamation plan calls for Article 6. Mineral Resource Management Policies <br /> resoiling, coarse hard mine waste shall be leveled and <br /> covered with a layer of finer material or weathered waste. § 3675. Definitions. The following definitions as used <br /> A soil layer shall then be placed on this prepared surface. herein shall govern the interpretation of these regulations: <br /> Surface mines that did not salvage soil during their initial Compatible Land Use.Land uses inherently compatible <br /> operations shall attempt, where feasible, to upgrade with mining and/or that require a minimum public or <br /> remaining materials.The use of soil conditioners,mulches, private investment in structures, land improvements, and r <br /> or imported topsoil shall be considered where revegetation which may allow mining because of the relative economic <br /> is part of the reclamation plan and where such measures value of the land and its improvements. Examples of such <br /> appear necessary. It is not justified, however, to denude uses may include, but shall not be limited to, very low <br /> adjacent areas of their soil, for any such denuded areas density residential, geographically extensive but low <br /> must in turn be reclaimed. impact industrial, recreational, agricultural, silvicultural, <br /> (g) Revegetation. When the reclamation plan calls for grazing, and open space. <br /> revegetation the available research addressing Incompatible Land Use. Land uses inherently <br /> revegetation methods and the selection of species having incompatible with mining and/or that require public or <br /> good survival characteristics,for the topography,resoiling private investment in structures, land improvements, and <br /> 21 <br />