Laserfiche WebLink
} <br /> 4 <br /> r i <br /> The reclamation plan provides that annual monitoring of the erosion control would be <br /> conducted. The plan does not specify the party responsible for these inspection. The <br /> annual County inspection of the mining and reclamation activities would be conducted by <br /> a professional approved by the County and would be a requirement for the project. <br /> P .` <br /> r <br /> l : <br /> I <br /> Et <br /> Draft Environmental Impact Report 9 ER-96-3 <br /> �R <br /> R <br />