My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24801
>
2600 - Land Use Program
>
PA-1800302
>
SU0012094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:38 AM
Creation date
9/6/2019 10:46:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012094
PE
2631
FACILITY_NAME
PA-1800302
STREET_NUMBER
24801
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20925020
ENTERED_DATE
12/4/2018 12:00:00 AM
SITE_LOCATION
24801 S LAMMERS RD
RECEIVED_DATE
5/17/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\L\LAMMERS\24801\PA-1800302\SU0012094\APPL.PDF \MIGRATIONS\L\LAMMERS\24801\PA-1800302\SU0012094\EH COND.PDF \MIGRATIONS\L\LAMMERS\24801\PA-1800302\SU0012094\EH PERMITS.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1800302 <br /> JUSTIN HOA& CATHERINE DINH/SACRAMENTO VALLEY LIMITED PARTNERSHIP <br /> Site Approval Application No. PA-1800302 was approved by the Community Development Department <br /> on August 13, 2019. The effective date of approval is August 23, 2019. This approval will expire on <br /> February 21, 2021, which is 18 months from the effective date of approval, unless (1) all Conditions of <br /> Approval have been complied with, (2) all necessary building permits have been issued and remain in <br /> force, and (3) all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Teddie Hernandez, [209]468-8359) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect.This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the"SITE <br /> PLAN CHECK LIST' for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit application. A <br /> fee is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is to construct a 70-foot tall monopole cell tower with a <br /> telecommunication facility within a 900 square foot lease area as shown on the Site Plan dated <br /> April 11, 2019. (Use Type: Communication Services—Type 11) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) The proposed tower and accompanying equipment cabinet shall be set back a minimum of <br /> thirty(30)feet from the front property line. (Development Title Section 9-510.3) <br /> (2) New freestanding support structures shall be located a distance equal to at least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title <br /> Section 9-1065.4[d]) <br /> e. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting <br /> equipment associated with wireless telecommunication shall be maintained in good condition by <br /> the provider of the telecommunication facility and, whenever necessary, repaired or replaced. <br /> (Development Title Section 9-1065.7) <br /> f. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for <br /> a period of six (6) consecutive months. Removal and site restoration shall be completed within <br /> ninety(90) days of the end of said six(6) month period. (Development Title Section 9-1065.8) <br /> g. TOWER LIGHTS AND PAINTING: For safety purposed, the communications tower shall be <br /> lighted and painted according to the following requirements: <br /> (1) Red lights shall be placed at or near the top of the tower. <br /> PA-1800302 (SA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.