Laserfiche WebLink
o Department of Public Works <br /> SAN J O A Q U I N <br /> ---COUNTY— Kris Balaji,Director of Public Works <br /> -- � �.;� <br /> Fritz Buchman,Deputy DirectorlDevelopment <br /> Greatness grows here. X <br /> wx 'Tcr YOU Alex Chetley,Interim Deputy DirectorlEngineering <br /> Jim Stone,Deputy Director/Operations <br /> July 19, 2019 Kristi Rhea,Manager of Strategic Initiatives <br /> CEWED <br /> MEMORANDUM <br /> TO: Community Development Department JUL 2 4 2019 <br /> CONTACT PERSON: Teddie Hernandez Sar,_70a0t?n County <br /> ConMLUUty Development <br /> FROM: Awni Taha, Interim Engineering Services Manager �'r <br /> Development Services Division <br /> SUBJECT: PA-1800302;A Site Approval application to construct an unmanned telecommunication <br /> facility consisting of a 70-foot monopole with associated ground equipment within a 900 <br /> square foot leased area; located on the west side of South Lammers Road,3,420 feet outh <br /> of West Eleventh Street,Tracy. (Supervisorial District 5) <br /> OWNER: Justin Hoa&Catherine Dinh APPLICANT: Sacramento Valley Limited <br /> ADDRESS: 24801 S. Lammers Road,Tracy APN: 209-250-20 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> Lammers Road has an existing and planned right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this application.The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this application.The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards.Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more.Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval,prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> AT: CH <br /> 1810 East Hazelton avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> In Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />