Laserfiche WebLink
05 November 2014 <br /> AGE Project No. 14-3119 <br /> Page 15 of 17 <br /> RESIDENTIAL CALCULATIONS: Nr = I x Nw (1-d)+ R x Nb = (I+R) <br /> Assumptions: <br /> 262,800 gallons _ 7.48 gallons per cubic foot = 35,133 <br /> 1 = 262,800 gallons = 35,133 cubic feet wastewater = [(2.68 acres x 43,560 feet') + 12 <br /> inches] = 3.61 inches/year <br /> NW= 45 mg/L-N <br /> d = 25 percent denitrification <br /> R = 13 inches/year <br /> Nb = 0.1 milligram per liter <br /> Nr = [3.61 inches/year x 45 mg/L-N (1-0.25)] + (13 inches/year x 0.1 milligram per liter) <br /> (3.61 inches/year + 13 inches/year) <br /> Nr = 135.26 = 16.61 = 8.12 <br /> Nr = 8.12 ppm nitrogen (NO3_N) <br /> COMMUNITY CHURCH CALCULATIONS: <br /> Restroom (Laboratory) Mass Loading - Assumptions: <br /> = 52,122 gallons = 6,968 cubic feet wastewater - [(2.68 acres x 43,560 feet') = 12 <br /> inches] = 0.716 inches/year <br /> NW = 85 mg/L-N <br /> d = 25 percent denitrification (new system) <br /> R = 13 inches/year <br /> Nb = 0.1 milligram per liter <br /> Nr = [0.716 inches/year x 85 mg/L-N (1-0.25)] + (13 inches/year x 0.1 milligram per liter) <br /> (0.716 inches/year + 13 inches/year) <br /> Nr = 45.6 = 13.716 = 3.4 <br /> Nr = 3.4 ppm nitrogen (NO3_N) <br /> 9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT <br /> The recharging of groundwater is the most likely potential feature that could be impacted <br /> by nitrogen loading. However, the potential vertical migration of the wastewater would be <br /> lesser with the current septic design. Based on the low volume of wastewater to be <br /> generated and the significant to ground water, the potential vertical migration would not <br /> likely degrade the local ground water. An additional of 3.4 ppm restrooms of additional <br /> nitrogen will be added to the subject site through waste water recharge; following final <br /> development of the community church. The residential mass loading of 8.12 ppm and the <br /> proposed church mass loading of 3.4 ppm with considering maximum capacity of the new <br /> church facility, could generated nitrogen loading greater than the desired value of 10 ppm. <br /> Advanced GeoEnvironmental,Inc. <br />