My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011360
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
11075
>
2600 - Land Use Program
>
PA-1200133
>
SU0011360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:07 AM
Creation date
9/6/2019 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011360
PE
2631
FACILITY_NAME
PA-1200133
STREET_NUMBER
11075
Direction
W
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
21217002
ENTERED_DATE
5/23/2017 12:00:00 AM
SITE_LOCATION
11075 W LARCH RD
RECEIVED_DATE
5/19/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LARCH\11075\PA-1200133\SU0011360\APPL.PDF \MIGRATIONS\L\LARCH\11075\PA-1200133\SU0011360\CDD OK .PDF \MIGRATIONS\L\LARCH\11075\PA-1200133\SU0011360\EH COND .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 31SJCOG , Inc . <br /> S JC0G,Inc. <br /> San Joaquin County Multi-Species Habitat Conservation &Open Space Plan <br /> 555 Fast Weber Avenue•Stockton,CA 95202• (209)235-0600• FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br /> Department, Engineering Department Survey Deoartment,Transportation Department, <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Mufti- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> t .:� �fi •'� b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation casements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> fust,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> .I b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1200133(SA) Time Extension <br /> } Landowner: Willis&Tiny Hill Applicant: Willis&Tiny Hill <br /> Assessor Parcel#s: 212-170-02 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact:Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.