Laserfiche WebLink
B. MOUND SYSTEM SITE PREPARATION <br /> The following calculations are for a mound system to serve the People of Christ Church facility. <br /> Pursuant to EHD requirements, the um in s stem for the of l <br /> P P g Y uent dis osal will con i <br /> p s st of a <br /> duplex pump arrangement, with the pumps alternating back and forth. General Construction Notes <br /> for the mound installation are found in the California State Water Resources Control Board- <br /> Guidelines for the Desire Installation and Operations of Mound Sewage Disposal Systems and <br /> the EPA Design Manual- On Site Wastewater Treatment and Disposal Systems. <br /> The location of the mound system is outlined on the Site Plans, and is proposed to be in the <br /> northeast comer of the subject property. Additionally, the mound must be constructed <br /> perpendicular to the general contour of the land and groundwater flow direction, which is assumed <br /> to be in a north-northeast direction. A 100%replacement area is designated to be directly south of <br /> the constructed mound system. Prior to the commencement of any and all construction activities, <br /> the proposed mound disposal area shall be cordoned off to prevent soil compaction by equipment <br /> driving over the area. <br /> At the start of mound construction, the native soil/sand media interface must be properly prepared. <br /> The native soil basal area must stripped of all native vegetation and then ripped to a depth of S <br /> inches. Soil moisture content at the time of ripping is critical and the soil should not be too wet or <br /> too dry. Ripping must be perpendicular to the surrounding land contour, which will be east-to- <br /> west, and only within the area of the sand/native soil interface. After plowing and before <br /> emplacement of the sand media, it is imperative that no equipment be driven over this area. <br /> C. CALCULATION OF MOUND DIMENSIONS <br /> BASAL LOADING RATE <br /> Due to the long-term acceptance rate anticipated, a conservative basal rate will be employed for <br /> design purposes. Consequently, a basal loading rate figure of 0.2 gallons/ftz/day will be used. <br /> HYDRAULIC LINEAR LOADING RATE <br /> From the percolation tests and direct observation of the soil from the infiltrometer test, it was <br /> evident that there was both vertical and lateral flow of water. Consequently, a linear loading rate <br /> of 6 gallons/lineal foot/day will be used. This linear loading rate will also allow for gaseous linear <br /> transfer of oxygen to meet the oxygen demand. <br /> SAND MEDIA/ GRAVEL BED SPECIFICATIONS AND LOADING RATE <br /> The filter media is typically a sand soil material that underlies the gravel bed. The sand media <br /> should be tested by an engineering laboratory, or be certified by the sand supplier before <br /> emplacement. A sieve analysis (ASTM C-33 Specifications) should demonstrate the sand media <br /> material must not have more than 20% (by wt.) of material greater than 2 mm dia. and no more <br /> than 2% (by wt.)passing the No. 200 sieve. Effective Diameter(d,o) should be 0.20 to 0.30 mm <br /> with a Uniformity Coefficient (D60/D10) of approximately <_4. The sand media loading rate <br /> complying with the specifications above will be 0.6 gpd/ftZ. <br /> 16 <br /> Chesney Consulting <br />