My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004272 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
11515
>
2600 - Land Use Program
>
PA-0300116
>
SU0004272 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:36 AM
Creation date
9/6/2019 10:48:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004272
PE
2632
FACILITY_NAME
PA-0300116
STREET_NUMBER
11515
Direction
W
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
11515 W LARCH RD
RECEIVED_DATE
4/1/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LARCH\11515\PA-0300116\SU0004272\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL COVER <br /> soil cover may consist of on-site silty clay surface soil (USCS =cl,ml)material. If landscaping <br /> rThe <br /> f the mound is desired, drought tolerant grass may be planted on the mound. Instant sod lawn <br /> rass will help prevent erosion of the soil cap. As referenced, the slopes must not exceed 3:1, which <br /> will place the height of the mound at approximately three feet higher than surrounding grade. The <br /> grass should only be irrigated during the spring and summer months by an "impact" type sprinkler <br /> that is timed to come on 3-5 times per day for short durations, taking into account prevailing winds. <br /> It is imperative that irrigation water does not percolate past the root zone of the grass to prevent <br /> hydraulic loading of the mound. This may require careful management and investigation by a <br /> landscape contractor. <br /> D. MOUND SYSTEM OPERATIO OMPONENTS <br /> CONFIGURATION �.mnusdSis=chargethe <br /> SISTRIBUTION NETWORK <br /> The distribution of pipi effluent uifomily-9v a gravel bed, with three-foot spaced <br /> orifices so that effluent application area is -47 %onfce. Force main(transport line)piping will be to <br /> center-feed manifold is c manifold by"cro n"and not"tee-to-tee." There <br /> will be a total nc laterals ree on each sid of the manif d,2.5 feet apa Orifices shall be pre-drilled <br /> with a sharp do e a is n¢uQ orifice shie] th@ di 1 en s of the six laterals <br /> will extend upward towards the ends of the mound with c of valves at th `turn-up" d with access <br /> boxes,as shown on the Plans. Z �y <br /> LATERAL LENGTH AND DIAMETER <br /> Piping to consist of PVC Schedule 40. As determined above, lateral length shall beC 1.5 ft ach lateral, <br /> including the I inch clean-out sweep assembly. The diameter shall be 1 inch I.D. <br /> PERFORATION SIZE, SPACING AND NUMBER PER LATERAL <br /> Perforations I e 5/32 in. dia. For effluent distribution applications to be -4 ft/orifice,the spacing of <br /> perforations 3 fee (area per orifice x no. of laterals on each side of center feed----(absorption area width) <br /> =4 ft'x 3 - ft= ft. The number of tions per lateral shall be: \` <br /> N=(p=x)+0. _(31.5 ft= 3 ft)+0.5 =21 p rforations per lateral x 61 tera = 126 total perforations <br /> LATERAL DISCHARGE RA, (LDR) <br /> Recommended distal ess s 5 ,translate t 0.68 per orifice. LDR=0.68 gpm/perforation x I 1 <br /> perforations/lateral '=7.5 gp I <br /> MANIFOLD AND FO E MAIN DIAMETER <br /> The force main and manifold shall be 2.0 in.I.D.,composed of PVC Schedule 40. <br /> NETWORK DISCHARGE RATE R) <br /> NDR=6 laterals x 7.5 gpm/later 1 -45 gpm. <br /> 18 <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.