Laserfiche WebLink
the pole lines to ensure the <br /> separation of conductors is <br /> maintained. <br /> Biological Resources 2: LID shall be required to follow all adopted LID LID shall utilize a Prior to construction <br /> measures under the SJMSCP and payment of mitigation fees for loss of qualified biologist to <br /> habitat associated with the new electrical and telecommunication survey any proposed <br /> facilities. construction site that may <br /> be near sensitive habitat <br /> and ensure that SJMSCP <br /> guidelines are followed in <br /> avoiding potential habitat. <br /> LID shall pay any <br /> applicable fees under the <br /> SJMSCP as required <br /> mitigation. <br /> Biological Resources 3: LID shall avoid all historic tree species in LID/Contractor LID shall utilize a Prior to construction <br /> accordance with the City of Lathrop Tree Ordinance or follow the qualified arborist t <br /> ordinance procedures for removal of a tree if such a tree cannot be identify the potential <br /> avoided. conflict with any heritage <br /> or protected species trees <br /> in accordance with the City <br /> Tree Ordinance and <br /> recommend a course of <br /> action for avoidance or <br /> removal. <br /> Cultural Resources <br /> Cultural Resources l: In the event that any prehistoric or historic LID/Contractor LID shall utilize a As necessary during construction <br /> subsurface cultural resources are discovered during trenching or other qualified archaeologist <br /> ground disturbing activities(i.e.,flaked stone artifacts,ground stone, and/or paleontologist to <br /> shell debris,historic glass,bone,etc.)all work within 100 feet of the assess any potential find <br /> resources shall be halted and LID shall consult with a qualified during construction <br /> activities. <br /> archaeologist or paleontologist to assess any potential significance of the <br /> find. If any find is determined to be significant,LID and the qualified <br /> archaeologist and/or paleontologist would meet to determine the <br /> appropriate avoidance measures or other appropriate miti ation. <br /> LID/Contractor LID shall notify any and As necessary during construction <br /> Cultural Resources 2: In the event that human remains are discovered <br /> all contractors of the <br /> during constriction activities,LID and its contractors shall follow CEQA <br /> Guidelines Section 15064.5(e)(1),which requires contact with and CEQA Guidelines and <br /> process should any human <br /> 139 <br />