Laserfiche WebLink
�I% <br /> q.4 IN. o <br /> O <br /> THOMAS M. GAU P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR 5201 <br /> �,C�. STO 68-300 CALIFORNIA <br /> D<irtl'w'N~ (209)4683000 FAX(209)468-2999 <br /> wwwsl9ov.org/pubworks <br /> FRRZ 6UCHMAN <br /> DEPUTY DIRECTOR T <br /> MICHAEL SELLING 7,yUa�'l' iip 1z, YOU <br /> DEPUTY DIRECTOR <br /> ROGER JANES RECEIVED <br /> BUSINESS ADMINISTRATOR <br /> OCT 2 2 2012 <br /> San Joaquin County <br /> Community Development <br /> October 22, 2012 <br /> MEMORANDUM <br /> TO: John L. Funderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Corinne King <br /> FROM: Alex Chetley, Engineering Services Manager A r <br /> Development Services Division /�� <br /> SUBJECT: PA-1200174;A Site Approval application to construct a v-shaped, double sided and illuminated off- <br /> premises billboard sign totaling 620 square feet with an overall height of 45 feet; located at the <br /> southeast comer of Lathrop Road and South State Route 99 East Frontage Road, Manteca. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Melvin M. &Judith Ann Abrew APPLICANT:Rogers Media Company <br /> ADDRESS: 5936 E. Lathrop Road,Manteca APN: 218-020-03 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area <br /> Lathrop Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> Frontage Road has an existing right-of-way width of 56 feet and a planned right-of-way width of the same. <br /> RECOMMENDATIONS: <br /> 1- The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.(Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br />