Laserfiche WebLink
D.A. PARRISH & SOPS 209 465 5736 03-24-97 15:14 r.n1 <br /> OFFICE S2'X54' (2,808 SO.FT.)(PHA5E 1) <br /> / SHOP 50'x100' (PHASE E) <br /> Q� ABOVE GROUND FUEL TANKS (PHASE 1) <br /> U PESTICIDE STORAGE 15'XEO'• (PHASE 1) <br /> ® TRUCK WASH 24'X50' (PHASE 1) <br /> © SHOP 5O'?f 100' (PHASE I I) <br /> EMIPMENT' STORAGE 30'X 100' (PHASE i E) fGd <br /> PARKING CARPORT CANOPY (PHASE Il) <br /> +` PAVED AREA <br /> LEACH FIELD CALCULATION <br /> GATEGORY� DAY WORKERS — OFFICE (30 GAL/PERSON/DAY) = 13 PEOPLc <br /> SOIL FACTOR = 0.250 <br /> (13) (20) + (1200 GAL) 1'590 GAL — USE 1600 GAL SEPTIC TANK <br /> (1590 GAL) (0.250) = 39 ,5 LEACH HNE RI<QI�IRED <br /> 4 LAHL �LTVI� <br /> NOTES <br /> I ACCESS DRIVEWAYS SHALL 5E PAVED riITH <br /> 3" AG OVER 9" GLASS 11 AS. <br /> c, PARKING AREAS SHALL BE PAVED WITH <br /> 3" AG OVER G" GLASS II AS, <br /> 3, AB SURFACING SHALL BE q4 GLASS I [ AB <br /> AS REOUESTED BY OY IER. MINIMUM ENGINEERED <br /> SECTION IS 14" GLASS 11 AB OVER PREPARED <br /> BASE. <br /> 4. THE LEACH FIELD AREA WILL Be L.ANPSGAPED <br /> YVJTH A DROUGHT TOLE=RANT GROUND COVER. <br /> r ,'i. .LY. L•iIGE: •;r PAVE <br /> 1 ' -X. .USN: <br /> r�' 'i J. ,�Q.L'I'ES.i•__,_ aJC :f�%!VL.r..�'?[, ����� qti� `• '/ <br />