Laserfiche WebLink
EXHIBIT "1" <br /> GloriAnn Project Description <br /> The Bacchetti Family has over 60 years of farming history, spanning three generations. <br /> Now known as FC Tracy Holdings, LLC, GloriAnn grows, packs and distributes fresh <br /> corn both national and internationally <br /> This project is the relocation of an existing sweet corn packing facility currently located <br /> at 11104 North Tracy Boulevard to a new state of the art sweet corn packing facility <br /> located on APN 255-040-20 (Lehman Road). The relocation of this facility will <br /> consolidate all offsite cold storage operations on-site, resulting in significantly improved <br /> packing efficiency and the elimination of approximately 1,049 raw product trucking <br /> transfers annually. (refer to Exhibit "Y) <br /> GloriAnn's custom packed sweet corn production and sales volumes have out grown <br /> their current packing facility located at 11104 North Tracy Boulevard. Increased <br /> production and sales volumes have dictated that GloriAnn transfer raw harvested sweet <br /> corn to multiple cold storage facilities in Tracy and Patterson for cooling, prior to <br /> packing. Sweet corn is packed at the Tracy Boulevard packing shed as well as their <br /> facility located in Brawley California. Multiple daily transfers of pre-chilled sweet corn <br /> are required to meter the flow of packing at the Tracy Boulevard facility in order to meet <br /> production requirements. The new packing facility will eliminate approximately 1049 raw <br /> product trucking transfers annually (refer to Exhibit "Y). <br /> All of the 219 employees shown on Exhibit "2A" (Employee Shift Census) are existing <br /> employees, located at the Tracy facility. <br /> Truck traffic congestion entering the packing facility is eliminated by implementing a "by <br /> appointment only" shipping/receiving schedule. (refer to Exhibit "2A" & "213") <br /> Overall employee traffic is diverted to non-commute hours by using early shift start/stop <br /> times and staggered shifts start/stop schedule. (refer to Exhibit "2A" Employee Shift <br /> Census) <br /> Gloriann Site Plan 2018-191 Project Description-Exhibit 1 <br /> 10/10/2018 <br /> Page 1 of 1 <br />