My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012027
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LEHMAN
>
3590
>
2600 - Land Use Program
>
PA-1800266
>
SU0012027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:36 AM
Creation date
9/6/2019 10:50:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012027
PE
2633
FACILITY_NAME
PA-1800266
STREET_NUMBER
3590
Direction
W
STREET_NAME
LEHMAN
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25504020
ENTERED_DATE
10/16/2018 12:00:00 AM
SITE_LOCATION
3590 W LEHMAN RD
RECEIVED_DATE
10/18/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\L\LEHMAN\3590\PA-1800266\SU0012027\APPL.PDF \MIGRATIONS\L\LEHMAN\3590\PA-1800266\SU0012027\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SJVUAPCD Indirect Source Review 9/18/19 <br /> Complete Project Summary Sheet & 1:12 pm <br /> Monitoring and Reporting Schedule <br /> Project Name: FC TRACY HOLDINGS <br /> ,6�pplicant Name: DELLABARCA DESIGN AND BUILD, INC <br /> Project Location: 3890 W. LEHMAN ROAD <br /> STATE HIGHWAY 33 <br /> APN(s): 255-040-20 <br /> Project Description: LAND USE: <br /> Light Industrial -159200 Square Feet-Warehouse <br /> Light Industrial - 159200 Square Feet-Warehouse <br /> Light Industrial - 159200 Square Feet-Warehouse <br /> Light Industrial - 159200 Square Feet-Warehouse <br /> ACREAGE: 52.2 <br /> ISR Project ID Number: C-20190381 <br /> Applicant ID Number: C-303176 <br /> Permitting Public Agency: COUNTY OF SAN JOAQUIN <br /> Public Agency Permit No. BUILDING PERMIT <br /> Existing Emission Reduction Measures <br /> Enforcing Agency Measure Quantification Notes <br /> There are no Existing Measures for this project. <br /> Non-District Enforced Emission Reduction Measures <br /> Enforcing Agency Measure Specific Implementation Source Of Requirements <br /> There are no Non-District Enforced Measures for this project. <br /> District Enforced Emission Reduction Measures <br /> Enforcing Agency Measure Specific Implementation Measure For District Review <br /> Compliance <br /> SJVAPCD Construction Clean Fleet For each project phase, Within 30-days of <br /> maintain records of total (Compliance Dept. completing <br /> hours of operation for all Review) construction for <br /> construction equipment, each phase <br /> greater than 50 horsepower, <br /> operated on site. Within 30- <br /> days of completing <br /> construction of each project <br /> phase, submit to the District a <br /> summary report of total hours <br /> of operation, by equipment <br /> type, equipment model year <br /> and horsepower. <br />
The URL can be used to link to this page
Your browser does not support the video tag.