Laserfiche WebLink
(§ 5.2, 5.3, and 5.4) A Log of Boring using the Unified Soil Classification System (U.S.C.S.), as <br /> observed in the perc test boring, is found on the EHD PERCOLATION TEST DATA SHEET. <br /> Generally,the underlying surface soils show a consistent very fine sandy silt/ clay soil with a high <br /> degree of stickiness. No cemented silts hardpan soil stratum was discernible. <br /> (§ 6.1) Percolation testing was conducted at the location illustrated on the Tentative Map found <br /> in Appendix C. This test location maintains sufficient distance requirements between wells, <br /> property lines, irrigation lines and ditches, etc. The following information describes the y <br /> preparation of the percolation test borings and the actual percolation testing: <br /> (§ 6.2, 6.3 and 6.5) On December 5, 2011, 0900 hrs, a shallow perc test boring of 42 inches was <br /> hand-drilled 100 ft to the southwest of the metal building. The sidewalls of the shallow boring <br /> were scored with a pry-bar and the loose material removed. Two inches of fine gravel was placed <br /> at the bottom and a three-inch perforated PVC pipe was inserted into the test boring. The boring <br /> was then pre-saturated with 18 inches of clear water. <br /> (§ 6.4) On December 6, 2011, 0930 hrs,percolation testing commenced. There was no standing <br /> water after the 24-hour soak period in the perc test boring due to the sandy-silty soil type, as 'f <br /> illustrated in Table 2 below. Consequently, EHD Perc Test Procedure 42 was conducted for the test <br /> boring. <br /> The last half hour of the test was witnessed by Ted Tasiopoulos, R.E.H.S. of the San Joaquin <br /> County Environmental Health Department. The maximum acceptable perc rate is 60 min/in for <br /> shallow perc tests and 30 min/in for the medium depth perc test borings. <br /> (§ 5.4 and 6.8) The following Table illustrates the proposed Parcel number, septic system <br /> structure to be installed based on the depth of the passing perc rate, proposed acreage, post soak <br /> period status and perc test results for the respective perc test. <br /> TABLE 2 <br /> PERCOLATION TEST:RESULTS AND RELATED DATA <br /> PROPOSED PARCEL PROPOSED PERC TEST DEPTHS POST SOAK PERC TEST <br /> POTENTIAL SEPTIC ACREAGE PERIOD RESULTS <br /> SVSTENI STRUCTURE STATUS <br /> 1 2.98+Acres 42 INCHES No Standing 9 min/in:]Parcel <br /> oot Leachlines Per Water in Hole PASSSTNCi <br /> Bedroom <br /> Parcel 2 47.85 t Acres NO PERCOLATION TESTS NIA NIA <br /> REQUIRED UNTIL THERE <br /> REMAINDER N <br /> DEIS A PROPOSAL TO <br /> BUILD ON THIS PARCEL. <br /> LLk; Page -3- <br /> Chesney Consulting <br />