Laserfiche WebLink
PURPOSE OF THIS ADDENDUM: Additional percolation tests to comply with current EHD <br /> standards. <br /> On 5-8 and 6-21 of 2002 percolation tests were conducted by permit SR29527. Parcel 2 tests <br /> met the test requirements. Parcel 1 and Parcel 3 tests failed. <br /> On August 15 percolation tests were conducted on Parcel I and 3. (SR30816) <br /> TESTING SUMMARY <br /> On August 14, 2002 the undersigned accompanied Hillside Drilling to the site. One shallow hole <br /> (36"-42") and one 25' hole were drilled by a truck mounted auger on the parcels to be tested. The <br /> hole depths were measured and conformed to depth requirements of the EHD. Mr. Walt Curtis, a <br /> Civil Engineer, licensed in the State of California, conducted the tests. Mr. Johnny Yoakum, <br /> R.E.H.S. was present for the critical readings. All tests failed to meet the current standards. The <br /> test reports are contained in this submittal. <br /> RECOMMENDATION <br /> Parcel 1 and Parcel 3 require a septic system designed by a e 'stered Sanitarianr Licensed p�� <br /> Civil Engineer. Parcel l tests are satisfactory. Additional t sting does not appear warranted. 'q <br /> WATER TESTS <br /> On Aug. 13,2002 the FGL Laboratory representative obtained a sample of water from the <br /> irrigation well on Parcel 1 for testing. The testing results are satisfactory (DBCP and Nitrates) <br /> and are included in this Addendum No. 1. <br /> This concludes our analysis and testing for the Francisco Pimental site. <br /> Eamesf F. Smith, P.E. <br />