My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004735 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LIBERTY
>
17559
>
2600 - Land Use Program
>
PA-0400727
>
SU0004735 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:10 AM
Creation date
9/6/2019 10:52:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004735
PE
2622
FACILITY_NAME
PA-0400727
STREET_NUMBER
17559
Direction
E
STREET_NAME
LIBERTY
STREET_TYPE
RD
City
CLEMENTS
APN
00909008
ENTERED_DATE
12/10/2004 12:00:00 AM
SITE_LOCATION
17559 E LIBERTY RD
RECEIVED_DATE
12/7/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LIBERTY\17559\PA-0400727\SU0004735\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L %%Re 140d <br /> LDecember 6,2004 <br /> NOA Project Number: E040130A <br /> 6.0 PERCOLATION TEST INFORMATION <br /> V 6.1 Percolation Test Locations <br /> L A site map indicating the locations of the percolation test holes is included as Plate 1 of this report. <br /> L6.2 Number of Percolation Tests <br /> One shallow and one deep percolation test were conducted on each proposed parcel of the Site, for <br /> La total of three shallow and three deep percolation tests. <br /> V16.3 Boring Preparation and Presaturation <br /> LThe soil borings on Parcels 1 and 2 were advanced on the Site with a truck-mounted B53 augur rig <br /> on November 17,2004. The soil borings on Parcel 3 were advance on the Site with the same drill <br /> Lrig on November 19,2004. <br /> A 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> Lwater in the percolation test boring. Approximately 2 inches of"pea gravel" were placed in the <br /> bottom of the open soil boring, then the PVC pipe was installed on top of the gravel. Several fee <br /> of"pea gravel'were backfilled in the annular space. <br /> L / Presaturation of the percolation test holes occurred on Sunday,November 28, 2004. The depth of <br /> water used to pre-soak was 12 inches above the bottom of the boring. <br /> LJ 6.4 Condition of Borings After Presaturation <br /> L After the 24-hour soak period,the presaturated holes were found to be intact on November 29, <br /> 2004. The deep holes were found to be dry,while standing water was observed in the shallow holes. <br /> LV 6.5 Percolation Test Procedure <br /> Percolation tests were conducted for the borings on Monday,November 29, 2004 in accordance <br /> L with the requirements of the EHD. A percolation test with a duration of four hours was performed <br /> for each hole. The final half-hour of each four-hour percolation test was observed by Ms. Lisa <br /> Medina, Registered Environmental Health Inspector, EHD. <br /> L <br /> L <br /> L <br /> L 9 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.