Laserfiche WebLink
2 <br /> e .< THOMAS R. FLINNVV1 P.O.BOX TO - ALI E. NIA 95 01 AVENUE <br /> `. . DIRECTOR n STOCK 68-3 CALIFORNIA 9568-299 8 <br /> (203)400-3000 fAX(20e)400--2959 <br /> ��tipg'R"p j w .co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> OEPUTY DIRECTOR <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE <br /> BUSINESS ADMINISTRATOR R EC E I V E D <br /> AUG i u ",n04 <br /> August 17,2004 <br /> Community Development Dept. <br /> MEMORANDUM <br /> TO: Kerry Sullivan,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Gillian Hayes <br /> FROM: Dean Gilman, Engineer IV ALL- <br /> Public Services Division F_ <br /> SUBJECT: PA-04-363 A MINOR SUBDIVISION APPLICATION TO CREATE TWO PARCELS IN A <br /> C-X (CROSSROADS COMMERCIAL). PARCEL ONE TO CONTAIN 4.86 ACRES AND <br /> PARCEL TWO TO CONTAIN 2.52 ACRES, LOCATED ON THE SOUTH SIDE OF EAST <br /> LIBERTY ROAD, 600 FEET EAST OF NORTH STATE HIGHWAY ROUTE 88. <br /> (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Lowell and Mary Rathe,TR APPLICANT: Dillon& Murphy <br /> ADDRESS: 21850 E. Liberty Road APN: 021-200-22 and 021-200-21 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Liberty Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. Dedication to result in a forty-two(42) foot wide right-of-way from the centerline of Liberty Road to the <br /> property line shall be required across the frontage of Parcel 2. Dedication shall be made on the Parcel <br /> Map. (Development Title Section 9-1150.5) <br /> 3. Structures, fences, landscaping and, any or all obstructions shall be removed from the dedicated right-of- <br /> way,prior to recording the Parcel Map. <br />