My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003937 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LIBERTY
>
3974
>
2600 - Land Use Program
>
PA-0200489
>
SU0003937 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:22 AM
Creation date
9/6/2019 10:53:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0003937
PE
2622
FACILITY_NAME
PA-0200489
STREET_NUMBER
3974
Direction
E
STREET_NAME
LIBERTY
STREET_TYPE
RD
City
GALT
APN
00509066
ENTERED_DATE
5/11/2004 12:00:00 AM
SITE_LOCATION
3974 E LIBERTY RD
RECEIVED_DATE
10/28/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LIBERTY\3974\PA-0200489\SU0003937\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APN: 005-09-66,56 <br /> PERCOLATION TESTS <br /> Testing procedures conform to the requirements of the Environmental Health Department of San <br /> Joaquin County. <br /> The test holes on both parcels were drilled with a truck mounted rotary drill rig. The soil profile <br /> was determined by 25'holes,one on each parcel. From 0-9'hard pan existed, 9-13 was soft silty <br /> sand with minor portion of clay, 13-15'dense cl/gravel, 15-22' silty sandy clay,moderate 'PW <br /> and 22-25' hardpan. Shallow holes were also drilled for testing,and sleeved with 4" PVC. All <br /> holes received 2" of small gravel on the bottom. Additional holes were drilled to the sandy layer. <br /> Testing was conducted on Dec. 3/4, 2002. Parcel 1 tests failed, Parcel 2 tests were satisfactory. 7 <br /> The December tests were performed by Mr. Walt Curtis, a licensed civil engineer. Shallow and <br /> deep holes were age,in u .parade and again tested on March 6, 2003,with satisfactory <br /> results at th�-11' level in the sand str . The tests in March were conducted by Earnest F. <br /> Smith. The to 6&g rP§nit�,:: i e m this report. Mr. Ted Tasiopoulos,EHS was present for <br /> the required readings and observations on Dec. 4,2003. Lisa Medina, SR. REHS, was present on <br /> Mar. 6, 2003 for the required readings and observations. The Sewage Standards of San Joaquin <br /> County require 8,000 SF leach field for both Parcels. (11-20 min./inch) Pits are required to reach <br /> the sandy layer. See SUMMARY for final comments. <br /> i <br /> Earnest F. Smith, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.