Laserfiche WebLink
yn?!'.i N..� <br /> ' � �4 <br /> " P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> THOMAS M. GAU _'.` STOCKTON,CALIFORNIA 95201 <br /> �'''. DIRECTOR I ,W"�0 f (209)468-3000 FAX(209)468-2999 <br /> °�ti'�o a" A36�7 I www.sjgov org/pubworks <br /> FRITZ BUCHMAN , „�.. _ <br /> DEPUTY DIRECTOR t RECEIVED <br /> MICHAEL SELLING Work . for YOU <br /> IIL..LL V <br /> DEPUTY DIRECTOR �"�6 p <br /> JIM STONE Kli — 9 2013 <br /> DEPUTY DIRECTOR <br /> ROGER JANES San Joaquin County <br /> BUSINESS ADMINISTRATOR Community Development <br /> October 8, 2013 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Megan Aguirre <br /> FROM: Alex Chetley, Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-1300090; A Minor Subdivision application to subdivide seven existing lots represented by <br /> six Assessor's Parcel Numbers(APN's) into seventeen new parcels all being over 40 acres; <br /> located on the southwesterly corner of Linne Road and Kasson Road, east of Tracy. <br /> (Supervisorial District 5) <br /> PROPERTY OWNER: Samam S. &Manjeet K. Sandhu APPLICANT: Eugene L.Vocu <br /> ADDRESS: 260 E. Linne Road,Tracy APN: 255-270-05, 20,23, 25, 37& 38 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Linne Road has an existing right-of-way width of 50 feet and a planned right-of-way width of the same. <br /> Kasson Road has an existing right-of-way width of 80 feet and a planned right-of-way width of the same. <br /> Koster Road has an existing variable-width right-of-way ranging from 40-50 feet and a planned right-of-way <br /> width of 60 feet. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br />