Laserfiche WebLink
-3 J <br /> Paulson x,14-9 <br /> 10/7/70 Resumed 8:00 A.M. Pulled 4 stands . Made up and ran Halliburton Hydrospring <br /> tester on 2-3/8" tubing, dry. Set packer at 3867' with perforated tail to 3884' . <br /> Opened 3/8" BHC at 10:30 A.M. 10/7/70. Had light steady blow of air through- <br /> out 1 hour test. Pulled tools and recovered 5' rise normal drilling mud. Pressure <br /> bomb charts showed tools were open 1 hour and functioned properly. WSO test at <br /> 3900' witnessed and approved by P. A. Williams of D.O.G. Rigged up lubricator <br /> and jet perforated 4-1/2" casing with 4H/F 3908'-3922' with 3-1/8" O.D. deep <br /> penetrating gun by Welex. Ran 125 Jts . and 1-10' pup used 2-3/8" O.D. 8 rd. <br /> the EUE tubing open-ended and landed on donut at 3924.52' K.B. Tore out BOPE <br /> and installed tree. Changed over to 63#/cf calcium chloride water and swabbed <br /> well in at 9:45 P.M. 10/7/70 pulling from a maximum depth of 1500' . Cleaned <br /> well up to sump on 5/16" choke nipple to a medium-heavy mist at a 2300 MCF/D <br /> rate with 980 psi tubing/400 psi casing. Closed well in at 10:30 P.M. In 10 <br /> minutes pressure rose to 1380 psi tubing/800 psi casing. Laid down swab, tore <br /> out blow line, cleaned pits and released rig at 12 midnight 10/7/70. <br /> 10/8/70 Shut in pressures at 8:00 A.M.: 1475#T/1245#C. Cleaned well up on 5/16" choke <br /> nipple. Stabilized, flowing clean gas at a 2 ,440 MCF/D rate with 1080#T/1110#C <br /> flowing pressures . Closed well in and pressures rose to 1600#T/1600#C in 15 <br /> minutes. <br /> Tubing detail: <br /> K.B. to tubing head: 11 .00' <br /> 1 - 10' 2-3/8" O.D. 8 rd. the EUE pup joint 10.00' <br /> 125 jts , used 2-3/8" O.D. 4.7# J-55 8 rd. the <br /> EUE tubing open-ended 3903 .52' <br /> Tubing depth K.B. : 3924.52' <br />