Laserfiche WebLink
r <br /> Kerry Sullivan <br /> COMMENTS ON DEVELOPMENT <br /> PA-04-303 (GP) <br /> 2. The project shall be served by a public water system conforming to the requirements of the San Joaquin <br /> County Public Health Services Environmental Services Division and the Department of Public Works. <br /> The system shall provide adequate domestic and fire water supply in conformance to the requirements of <br /> the County Fire Warden and the local Fire District. The applicant shall be required to pay the <br /> proportionate costs of a water supply feasibility study as well as proportionate costs for any new facilities <br /> required or expansion of existing system facilities necessary to serve the development. <br /> (Development Title Section 9-1120.2) <br /> 3. The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of the San Joaquin County Public Health services Environmental <br /> Services Division and the Department of Public Works. A wastewater treatment plant study acceptable <br /> to the Department of Public Works and San Joaquin County Public Health Services Environmental <br /> Services Division is required prior to the approval of the improvement plans of any work within the site. <br /> The applicant shall be required to pay the proportionate costs of the feasibility study. Pending the results <br /> of the study,the applicant shall be required to pay the proportionate costs of expanding the existing <br /> sewer treatment system as necessary to serve the development. (Development Title Section 9-1105.2) <br /> DTP:DG:ar <br /> P:\COM1A WSN GPPA-0400303.wpd <br />