Laserfiche WebLink
PA-04-303 (GP, Pre-applArtbn) <br /> Page 2 of 2 <br /> C. Written Confirmation is required from Public Works Department that improvements have <br /> been constructed or financial arrangements have been made for any improvements for public <br /> sewer required by the agency. In addition, written confirmation from the Public Works <br /> Department that the agency has or will have the sewer capacity to serve the development is <br /> also required(San Joaquin County Development Title, Section 9-1100.3). <br /> D. Connection to an approved public water supply system is required (San Joaquin County <br /> Development Title, Section 9-1120.2) <br /> a. Test well will be required to meet the following: <br /> 1. Water quality tested to meet Title 22, CCR (Safe Drinking Water Act) <br /> requirements. <br /> 2. Water quantity tested to show an adequate source. <br /> 3. Results approved by the Environmental Health Department and County Public <br /> Works prior to final approval of improvement plans. <br /> b. A letter from the water supplier will be required stating that they have the capacity to <br /> serve the development and that the system meets State standards prior to recording the <br /> final map (San Joaquin County Development Title, Section 9-1100.3). <br /> E. This project shall be provided with public water service at the time of Final Map <br /> recordation. A letter shall be submitted from the purveyor stating that these services either <br /> are bonded for or are in place, prior to final approval (San Joaquin County Development <br /> Title, Section 9-1120.2). <br />