My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002170
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKE
>
12470
>
2600 - Land Use Program
>
UP-00-09
>
SU0002170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 12:05:41 PM
Creation date
9/6/2019 10:59:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002170
PE
2626
FACILITY_NAME
UP-00-09
STREET_NUMBER
12470
Direction
E
STREET_NAME
LOCKE
STREET_TYPE
RD
City
LOCKEFORD
APN
05132004
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
12470 E LOCKE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LOCKE\12470\UP-00-09_SA-00-36\SU0002170\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION - COMMERCIAL BUILDING PERMIT <br /> �aP : •.00 SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> �` '•� 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> INSPECTION REQUEST-24 HOUR RECORDER: (209)468-3165 <br /> C9Clp ORN�P <br /> PERMIT NO. <br /> THIS PORTION OF THE APPLICATION MUST BE COMPLETELY FILLED OUT BY THE APPLICANT <br /> IN ORDER TO APPLY FOR PERMITS REQUIRED TO BUILD A COMMERCIAL STRUCTURE. <br /> Scope of Work: roS <br /> Site Address: 1Z,17,J LoG/ <br /> OWNER NAJAIE AND ADDRESS APPLICANT NAME AND ADDRESS <br /> Name: LLC Name: $ <br /> Address: / Address: <br /> City: State: C City: State: <br /> ZIP: SZ 3-7 1 Ph:Qoi)7Z--7— 770 ZIP: Ph:( ) <br /> CONTRACTOR INFORMATIONPh-.A) 9 .7 7e) <br /> Lic.No: 3 Company Name: �' l�Tr ••-rr C. <br /> Address: _54M & City: St' ZIP: <br /> DESIGNER INFORMATION Ph:( ) <br /> Lic. No: Company Name_ <br /> Address: City: St: ZIP: <br /> BUSINESS INFORMATION Business Owner. <br /> Business Name(DBA): O 1 rrvtGv Mailing Address: •5 CHECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT Check <br /> SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. off <br /> 1. One completed application for a Commercial Building Permit <br /> 2. Three complete sets of construction drawings prepared by an architect or engineer. (NOTE: All sheets of the <br /> working drawings must be stamped and wet signed prior to issuance of permit) The plans must include: <br /> • Site plan. (NOTE: See the Site Plan Check List regarding requirements for the Site Plan.) <br /> • Structural plans. <br /> • A complete floor plan, including room usage,exiting plan and complete dimensions. (NOTE: For <br /> remodels and additions,the existing and proposed floor plans must be shown in their entirety.) <br /> • Plumbing and mechanical plans,Including ventilation. <br /> • Electrical plans,including a complete on-line diagram of the service and feeders. / <br /> Disabled Access compliance. <br /> V <br /> 3. Two sets of structural calculations,stamped and signed with a wet signature. <br /> 4. Two sets of complete construction specifications. <br /> 5. If prefabricated trusses are included in the scope of work,two sets of the following are required: <br /> • Complete truss layout designating each type of truss to be used. <br /> • Engineered truss plans and calculations which are cross-referenced to the truss layout plan. <br /> Lateral bracing plans. <br /> • Details of any special features such as girder trusses,hangers between interconnected trusses, <br /> connections between trusses and beams,etc. <br /> • A letter signed by the responsible engineer or architect,stating that he/she has reviewed and approved <br /> the truss calculations and drawings,or either a shop approval stamp and signature or the responsible <br /> engineer's or architect's stamp and signature. <br /> 6. Two sets of non-residential energy calculations with all required fortes imprinted on drawings. <br /> 7. One extra copy of the floor plan. Section 72 of the Revenue and Taxation Code now requires a copy of a <br /> complete floor plan of the proposed work to be given to the County Assessor. <br /> 8. One extra site plan to be given to the Department of Public Works at the time of Building Permit application. <br /> 9. One copy of a completed Hazardous Materials Disclosure Survey forth Is required if the building permit ✓ <br /> application does not require discretions approval(e.g.,Use Permit or Site Approval). Surve form is attached. <br /> 10. Permit Deposit <br /> APPLICANT: ONLY THE OWNER OF-THE PROPERTY OR A LICENSED CONTRACTOR MAY TAKE OUTBUILDING <br /> PERMITS.. <br /> Owner-Builder must submit the following with the application: Contractor must submit the following with the application: <br /> • A property tax statement or a recorded deed • Current license numbers and a worker's compensation <br /> • A completed and signed "Owner-Builder Verification" insurance certification (this is not necessary if this <br /> forth information is already on file with the Department) <br /> • A completed"Authorization for Application"form if other • A waiver form if the contractor is not subject to worker's <br /> than the owner applies compensation laws <br /> • A completed "Authorized to Sign" form if other than the <br /> contractor applies(this is not necessary if this information <br /> is already on file with the Department) <br /> c of ma•um,rtM IYPRX(IYY app pN{/1 W9} <br />
The URL can be used to link to this page
Your browser does not support the video tag.