Laserfiche WebLink
r.. <br /> Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-649 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is$846.00 per 1,000 gross square foot of <br /> building designated as Warehouse in the Lockeford area. The fee shall be automatically adjusted July I <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. The northwestern portion of the parcel is located within the 100-year floodplain. Therefore, all new <br /> structures or substantial improvements constructed within the 100-year floodplain shall be elevated a <br /> minimum of one(1) foot above the 100-year flood elevation of seventy(70). <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> FXO� Ak"20 TA-N0 9.wpd <br />