Laserfiche WebLink
..l <br /> Raymond Hoo -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-268 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$187.15 per additional daily trip-end generated in <br /> the Lockford area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.)(Resolutions 00-433) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$1,250.00 per 1000 gross square foot of building. <br /> The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. The proposed expansion will increase the amount of runoff as a result of increasing the impervious surface <br /> area. Therefore,post expansion discharge to the existing storm drainage systems shall be attenuated to the <br /> pre-expansion discharge. Consequently, a detention pond with adequate capacity shall be required for the <br /> additional runoff generated as a result of the proposed project. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:av <br /> P:\CON M SI A\Y 2006\PA-0 268.wpd <br />