Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> THOMAS R.FLINNTOR <br /> r' DEPARTMENT OF PUBLIC WORKS DEPunDiaecLOPEZ <br /> oa <br /> P.O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL <br /> AN U DIRECTOR <br /> •.,$, —_ STOCKTON,CALIFORNIA 95201-1810 STEVEN WINKLER <br /> 209/468-3000 DEPUTY DIRECTOR <br /> FAX:209/468-2999 <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> January 28, 2000 <br /> MEMORANDUM <br /> TO: Thomas M" Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> FROM: Gabriel Karam, Senior Civil Engineers K <br /> Public Services Division <br /> SUBJECT: SA-99-98 A SITE APPROVAL APPLICATION FOR AN AGRICULTURAL <br /> TRUCK PARKING FOR TWO (2) TRUCKS AND FOUR (4) TRAILERS, <br /> LOCATED ON THE SOUTHWEST CORNER OF LOCKHART ROAD AND <br /> HOWARD ROAD, WEST OF FRENCH CAMP. (DISTRICT 1). <br /> APPLICANT: Frederico Prado, Jr. APN: 193-180-88 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Lockhart Road has an existing right-of-way width of 50 feet and a planned right-of-way width of <br /> 50 feet. Howard Road has an existing right-of-way width of 80 feet and a planned right-of-way <br /> width of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $167.96 per <br /> additional daily trip-end generated in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RH:af <br /> PS-OA112-AIF <br /> E: Manuel Lopez, Deputy Director/Development <br />