Laserfiche WebLink
nAc:ie."f Are, <br /> i <br /> THOMAS R. FLINN P.O.BOT CKT- ,C E. FORMA 52 AVENUE <br /> 01 <br /> DIRECTOR STO 68-300 CALIFORNIA68-29 <br /> (209)4683000 FAX(209)468-2999 <br /> y � wwwsjgov.org/pubworks <br /> THOMAS M.GAU 01- <br /> Lniiah <br /> CHIEF DEPUTY DIRECTOR b;�`4yT. <br /> MANUEL SOLORIO WL5II7Ymg fcw YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> October 30,2008 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Bill DuBois,Engineer III <br /> Public Services Division <br /> SUBJECT: PA-0800204(REVISED)A SITE APPROVAL APPLICATION TO CONVERT AN EXISTING 1,000 <br /> SQUARE FOOT BARN INTO AN OFF-SITE WINE CELLAR THAT WILL INCLUDE A 450 <br /> SQUARE FOOT TASTING ROOM WITH MARKETING EVENTS,LOCATED ON THE WEST <br /> SIDE OF LOCUST TREE ROAD, %MILE SOUTH OF STATE ROUTE HIGHWAY 12,EAST OF <br /> LODI. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Vic &Carrie Mettler APPLICANT: Baumbach&Piazza, Inc. <br /> ADDRESS: 16475 N. Locust Tree Road, Lodi APN: 051-130-75 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Locust Tree Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Based upon the marketing plan for a maximum of 50 people for any event, the requirement for a traffic study <br /> is waived. In the event that events are held for more than 50 people, Public Works reserves the right to require <br /> a traffic study to be performed to determine the impacts and mitigation of the proposed project. The applicant <br /> shall deposit funds with the County for all costs, as estimated by the Department of Public Works <br /> Transportation Planning Division,prior of Department of Public Works preparing or contracting for the <br /> required study. (Development Title Section 9-1150.4) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$207.97 per additional daily trip-end generated. The <br /> fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.)(Resolution R-00-433) <br />