Laserfiche WebLink
Vic, <br /> The sewage disposal system needs to demonstrate that it is barricaded and not within <br /> the parking area(s) that are proposed. That condition is stated on your list of conditions. <br /> However, the design of the submitted sewage disposal is acceptable. Dimensions still <br /> need to be depicted and a scaled revised map shall be submitted to the EHD. <br /> Lisa <br /> From: Vic Mettler - Zapline [mailto:vmettler@zapline.com] <br /> Sent: Monday, December 08, 2008 1:32 PM <br /> To: Lisa Medina [EH] <br /> Subject: FIN: Revised Site Plan <br /> Lisa, <br /> Can your review and let me know if this satisfies your requirement for the Septic and <br /> Leach area? <br /> Thanks vic <br /> Vic Mettler <br /> President <br /> vMv-Zapline Inc <br /> phone: 209-481-3386 <br /> fax: 209-554-4343 <br /> vmettler(a)vmvinevards.com — www.vmvineyards.com <br /> From: Josh Elson [mailto:jelson@bpengineers.net] <br /> Sent: Monday, December 08, 2008 1:12 PM <br /> To: 'Vic Mettler - Zapline' <br /> Subject: Revised Site Plan <br /> Vic, <br /> I think the attached site plan should work for you. Let me know. <br /> -Josh <br />