Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0800182 <br /> Watts <br /> Site Approval Application No. PA-0800182 was approved by the San Joaquin County Community <br /> Development Department on August 26, 2008. The effective date of approval is September 5, 2008. <br /> This approval will expire on March 7, 2010, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Jason Jones, 209468-3136) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a Small Winery to include the expansion of an existing off- <br /> site wine cellar into a small winery with a maximum production capacity of 200 tons of grapes to <br /> be completed in two phases as shown on the revised site plan dated August 1, 2008. Phase 1 <br /> includes the conversion of an existing 6,561 square foot agricultural building into a winery <br /> production building. Phase 2 includes a new 7,500 square foot wine production building and <br /> office, a 3,000 square foot roof cover and a 2,500 square foot tasting room and administrative <br /> building to be completed within 5 years. (Use Type:Wineries and Wine Cellars-Winery) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> e. STORM DRAINAGE: Any additional storm water drainage created by new improvements shall be <br /> retained on-site. The drainage pattern and corresponding storm drain improvements shall be shown <br /> on the Site Plan. Drainage calculations prepared by a registered civil engineer or architect shall be <br /> included. (Development Title Section 9-1135) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All winery driveways and maneuvering areas shall be surfaced and permanently maintained with <br /> base material of appropriate depth and chip seal, asphalt or cement to provide a durable, dust <br /> free surface. Bumper guards shall be provided when necessary to protect adjacent structures or <br /> properties (Development Title Section 9-1015.5[e]). <br /> Conditions of Approval - 1 - PA-0800182 <br />